Inspections for the day of: Friday, May 18, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM98-02326 Plumbing Rough-in5/16/20015/18/20015/18/2001 12:00:00 AMAPART
conference to extend permit###-#### its ok with me to extend this permit 5/17/2001 9:23:36 AM
PLM00-03486 Final5/17/20015/18/20015/18/2001 12:00:00 AMAPASS
gene ###-####
PLM01-01204 Plumbing Rough-in5/17/20015/18/20015/18/2001 12:00:00 AMAPASS
gene ###-####
PLM01-01566 Plumbing Rough-in5/17/20015/18/20015/18/2001 12:00:00 AMAPASS
###-####
PLM01-01568 Water and/or Sewer5/17/20015/18/20015/18/2001 12:00:00 AMAPASS
Jim ###-####
PLM01-01061 Final5/18/20015/18/20015/18/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/18/2001 at 07:10:53. Contact: ###-####.
PLM00-02912 Plumbing Rough-in5/18/20015/18/20015/18/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 05/18/2001 at 07:36:18. Contact: ###-####. last of the kitchen w&v gw 5/18/2001 3:20:24 PM
PLM00-04083 Final5/18/20015/18/20015/18/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 05/18/2001 at 09:34:54. Contact: ###-####. temp occ ok set x-ray etc. 5/18/2001 4:02:10 PM
PLM00-03202 Groundwork5/18/20015/18/20015/18/2001 12:00:00 AMPPART
Added by Inspector: 330 On 5/18/2001 3:21:12 PM dlb containment in loading dock
PLM01-01573 Water and/or Sewer5/18/20015/18/20015/18/2001 12:00:00 AMPPASS
Added by Inspector: 330 On 5/18/2001 4:14:07 PM final ok with proper bedding on both sewer and water lines
PLM01-01565 Sprinkler (Final)5/17/20015/18/20015/18/2001 12:00:00 AMPPASS
Tim ###-####