Inspections for the day of: Friday, May 18, 2001.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Lightfoot
TitleMEC-STR/MEC INSPECTOR
Phone #794-9463
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-00645 Rough-in5/17/20015/18/20015/18/2001 12:00:00 AMAPART
###-#### need shoe nail plates on gas pipe all lower units 5/18/2001 12:22:22 PM
MEC00-03577 Final5/17/20015/18/20015/18/2001 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 05/17/2001 at 16:07:45. Contact: ###-####. can not meet me 5/18/2001 11:54:46 AM
MEC01-00269 Final5/17/20015/18/20015/18/2001 12:00:00 AMAFAIL
mark-- ###-#### c/n posted 5/18/2001 11:38:05 AM
MEC01-00340 Final5/17/20015/18/20015/18/2001 12:00:00 AMANR
Scheduled by a contractor via Hello! on 05/17/2001 at 17:10:06. Contact: ###-####.
MEC01-01214 Final5/16/20015/18/20015/18/2001 12:00:00 AMAFAIL
John Morris ###-#### please call in all closed in 5/18/2001 10:05:58 AM
MEC01-01473 Pressure Test5/17/20015/18/20015/18/2001 12:00:00 AMAFAIL
Susan ###-#### ext 106 please call before you go out... no contact 5/18/2001 10:05:18 AM
MEC01-01216 Final5/17/20015/18/20015/18/2001 12:00:00 AMANH
house move ###-####
MEC01-01477 Rough-in5/17/20015/18/20015/18/2001 12:00:00 AMAPASS
merle ###-####
MEC01-01477 Pressure Test5/17/20015/18/20015/18/2001 12:00:00 AMAPASS
merle ###-####
MEC01-00926 Final5/17/20015/18/20015/18/2001 12:00:00 AMAPASS
###-####
MEC01-01209 Final5/17/20015/18/20015/18/2001 12:00:00 AMPPASS
MIKE ###-#### BETWEEN 3 AND 4 PLEASE
MEC01-01483 Final5/18/20015/18/20015/18/2001 12:00:00 AMPCANC
ted--###-#### fn done by jim storey 5/18/2001 3:47:00 PM
MEC00-03059 Final5/18/20015/18/20015/18/2001 12:00:00 AMPPASS
STeve ###-#### after 1:30 please sign occ card 5/18/2001 2:44:20 PM
MEC00-03410 Final5/18/20015/18/20015/18/2001 12:00:00 AMPPASS
Steve ###-#### after 1:30 sign occ card 5/18/2001 2:44:39 PM
MEC01-01487 Pressure Test5/18/20015/18/20015/18/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 05/18/2001 at 10:09:51. Contact: ###-####. need roof access 5/18/2001 5:04:18 PM
MEC01-01345 Final5/18/20015/18/20015/18/2001 12:00:00 AMPNH
###-#### they won't be there until after 4 pm