BLD01-01173
| BLD-Final | 5/17/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | A | PASS |
|
|
Demolition of bldg...lot is cleared, unable to determine sewer cap 5/18/2001 9:19:20 AM
|
BLD01-00896
| BLD-Foundation | 5/17/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/17/2001 at 15:53:46. Contact: . walls ok to grout 5/18/2001 10:03:30 AM
|
BLD00-03643
| BLD-Footing | 5/17/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | A | PART |
|
|
ft insp -- ###-####- bill...int ftgs, some of north fnd wall 5/18/2001 8:50:26 AM
|
BLD01-00450
| BLD-Energy code compliance | 5/16/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/16/2001 at 08:06:54. Contact: ###-####. ok per415 5/18/2001 9:10:26 AM
|
BLD01-00451
| BLD-Energy code compliance | 5/16/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/16/2001 at 08:09:24. Contact: ###-####. ok per 415 5/18/2001 9:11:53 AM
|
BLD00-01631
| BLD-Final | 5/17/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | A | FAIL |
|
|
###-####, need fire, eng's ok letter, complete ha 5/18/2001 1:17:05 PM ndrails as need, etc, recall 5/18/2001 1:17:24 PM
|
BLD01-00847
| BLD-Framing/Rough-in | 5/17/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | P | PART |
|
|
###-#### c/n, rafter support at ridge,fireblox, ok to ins pend. elec. ok 5/18/2001 5:49:00 PM
|
BLD01-00223
| BLD-Framing/Rough-in | 5/16/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | P | PART |
|
|
shear on gar -wendy-- ###-#### ...may req int osb at gar door... 5/18/2001 5:02:33 PM
|
MEC01-01463
| Rough-in | 5/18/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | P | FAIL |
|
|
###-####; c/n, seal duct, show specs for hi-velocity system, install flues, show specs for boiler... 5/18/2001 4:54:56 PM
|
MEC01-01463
| Pressure Test | 5/18/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | P | FAIL |
|
|
c/n pipe sizing diagram 5/18/2001 4:50:32 PM
|
BLD00-01631
| BLD-Conference | 5/18/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 5/18/2001 1:12:19 PM w/ Tempra, need resolve historical issues
|
BLD01-00452
| BLD-Conference | 5/18/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 5/18/2001 1:18:56 PM w/ bldr...need clarify fire issues
|
BLD01-01257
| BLD-Conference | 5/18/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 5/18/2001 1:38:43 PM w/ owner re insps for final
|
BLD00-02779
| BLD-Conference | 5/18/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 5/18/2001 5:04:54 PM rails are installed, no resub. rec'd
|
BLD00-03519
| BLD-Conference | 5/17/2001 | 5/18/2001 | 5/17/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/17/2001 at 09:43:38. Contact: ###-####.--cancel per scott kimball
|