FIR01-00300
| INSP-Supply line flush | 5/17/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/17/2001 at 14:09:44. Contact: ###-####. Ok to cover Riser stub in to bldg 5/18/2001 10:52:21 AM
|
BLD01-00426
| FIRE-Final Inspection | 5/17/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | A | FAIL |
|
|
Greg ###-#### Final Fail C/N issued 5/18/2001 9:34:13 AM
|
FIR01-00122
| INSP-Supply line flush | 5/17/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/17/2001 at 11:45:55. Contact: ###-####. OK on supply line flush 5/18/2001 12:56:30 PM
|
FIR01-00272
| INSP-Alarm Testing | 5/17/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/17/2001 at 13:27:54. Contact: ###-####. Final Fail need correct size batteries 5/18/2001 2:06:47 PM
|
FIR01-00319
| INSP-Sprinkler Rough-in | 5/18/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | P | PART |
|
|
underground Becky ###-#### OK to cover supply line from riser to loop end 90 5/18/2001 3:19:28 PM
|
BLD01-00426
| FIRE-Final Inspection | 5/18/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | P | FAIL |
|
|
###-#### Reinsp Fail Access controlled exit doors 5/18/2001 4:46:22 PM
|
BLD01-00703
| FIRE-Final Inspection | 5/18/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | P | PASS |
|
|
###-#### reinspection REinsp OK for permanant occupancy 5/18/2001 2:20:59 PM
|
BLD00-03631
| BLD-Final | 5/18/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 406 On 5/18/2001 2:12:10 PM Reinsp Fail Fire door and batteries in FACP, Knox Box, breaker lock for FACP
|