Inspections for the day of: Monday, May 18, 2009.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-00986 General Inspection5/18/20095/18/20095/19/2009 3:29:23 PMPFAIL
Message to RP:
1. Protect the storm drain on the new paved road.
2. clean up all tracking from project onto Whisperwood.
3. Maintain concrete washout.
will re-inspect on 5/22/09 AM
ESC08-00700 Tracking Control5/18/20095/18/20095/19/2009 8:25:13 AMPFAIL
Correction Notice to G.C.( left am message for Travis Shelton on 5/18/09:
1. Provide a valid RP that has day to day control over project.
2. Clean up all tracking onto Whisperwood for project area. (multiple spots)
3. Post ESC sign at the front of the project area where visable from the street.
** Failure to comply by 5/19/09PM will result in a stop work order. Will re-inspect on 5/20/09 AM.
ESC09-00113 Tracking Control5/18/20095/18/20095/18/2009 2:58:04 PMPFAIL
Verbal to RP:
1. Clean up all trackin onto street where gravel fill is being brought in. This will be the last day of flat work.

Also discussed with RP over stabilizing stock piles on lot to the east. If stockpiles are sitting for more than 30 days temporary stabilized or not, a permit is required. RP is waiting on the go on a duplex unit on that lot. So I have given the ok for 30 days or until permit is issued for the duplex unit. Will re-inspect on this issue on 6/18/09.
ESC09-00114 Tracking Control5/18/20095/18/20095/18/2009 2:57:41 PMPFAIL
Verbal to RP:
1. Clean up all trackin onto street where gravel fill is being brought in. This will be the last day of flat work.

Also discussed with RP over stabilizing stock piles on lot to the east. If stockpiles are sitting for more than 30 days temporary stabilized or not, a permit is required. RP is waiting on the go on a duplex unit on that lot. So I have given the ok for 30 days or until permit is issued for the duplex unit. Will re-inspect on this issue on 6/18/09.
ESC09-00223 Site Preparation5/11/20095/18/20095/18/2009 2:10:22 PMANR
ESC09-00164 General Inspection5/18/20095/18/20095/18/2009 12:54:42 PMPPASS
Dischaging into the park. Has not reached the boise river. Water is not turbid.
ESC09-00225 Site Preparation5/13/20095/18/20095/18/2009 10:58:21 AMAPASS
ESC09-00241 Site Preparation5/18/20095/18/20095/18/2009 10:35:09 AM NR
ESC09-00193 BMP Violation5/11/20095/18/20095/18/2009 10:12:00 AMAPASS
ESC08-00675 General Inspection5/18/20095/18/20095/18/2009 9:50:04 AM PASS
ESC08-00666 General Inspection5/18/20095/18/20095/18/2009 9:38:27 AM PASS
ESC08-00638 General Inspection5/18/20095/18/20095/18/2009 9:25:37 AM PASS
ESC09-00179 Site Preparation5/18/20095/18/20095/18/2009 9:12:30 AM NR
ESC07-00070 BMP Violation5/7/20095/18/20095/18/2009 9:04:34 AMAFAIL
Moved to a STOP WORK ORDER.
ESC07-00070 INSP - Stop Work Order5/18/20095/18/20095/18/2009 9:04:24 AMAFAIL
Message to RP:
Due to the time frame given to the city for the stabiilize the gully that has formed on east side slope that has not been addressed. A STOP WORK ORDER is issued. No work can occur except pertaining to erosion and sediment control until gully is stabilized per industry standards and an inspection has been completed and approved by the city's Erosion Control division.
ESC04-01055 BMP Violation5/11/20095/18/20095/12/2009 1:33:11 PMAPASS
All sediment removed off of the property to the north. This is the complaintee's property.