MIS14-00184
| MIS-Aging Inspection | 5/18/2015 | 5/18/2015 | 5/20/2015 11:03:22 AM | | CANC |
|
|
|
BLD15-01258
| BLD-Framing/Rough-in | 5/18/2015 | 5/18/2015 | 5/18/2015 5:58:49 PM | P | PART |
|
|
Steve Phone #: ###-#### 2nd floor beam and joists ......OK.
|
BLD15-00315
| BLD-Blower Door Test Results | 5/18/2015 | 5/18/2015 | 5/18/2015 5:58:45 PM | P | CANC |
|
|
Trench ... Last time if possible (after 4) please call // Art Phone #: ###-#### Trench for Electr and electr Grounding? advised to obtain Electr permit and insp.
|
BLD15-01594
| BLD-Conference | 5/16/2015 | 5/18/2015 | 5/18/2015 5:58:44 PM | P | PASS |
|
|
Roof recovered 3 tab shingles with light grey architecturals. Phone #: ###-#### Inspection requested via web by Jon Kimball
|
BLD15-00372
| BLD-Final | 5/18/2015 | 5/18/2015 | 5/18/2015 5:58:39 PM | P | PASS |
|
|
Phone #: 9144370 >> Inspection requested via mobile web by Bryan Millar
|
BLD15-00366
| BLD-Framing/Rough-in | 5/15/2015 | 5/18/2015 | 5/18/2015 5:58:38 PM | P | PASS |
|
|
Clarence Phone #: ###-####
|
BLD15-00839
| BLD-Footing | 5/15/2015 | 5/18/2015 | 5/18/2015 5:58:30 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD15-01594
| DOC - Permit Finaled | 5/18/2015 | 5/18/2015 | 5/18/2015 5:58:30 PM | P | PASS |
|
|
|
BLD15-00372
| DOC - Permit Finaled | 5/18/2015 | 5/18/2015 | 5/18/2015 5:58:28 PM | P | PASS |
|
|
|
BLD15-01276
| BLD-Wall Bracing | 5/15/2015 | 5/18/2015 | 5/18/2015 11:38:20 AM | A | PASS |
|
|
larry Phone #: ###-####
|
GCB14-00171
| GCB-Shearwall | 5/14/2015 | 5/18/2015 | 5/18/2015 11:37:19 AM | A | PASS |
|
|
Mike ###-####
|
BLD15-01102
| BLD-Footing | 5/15/2015 | 5/18/2015 | 5/18/2015 10:50:02 AM | A | PASS |
|
|
Krystal Phone #: ###-####-would like done as early as poss
|