BLD15-01267
| BLD-Footing | 5/15/2015 | 5/18/2015 | 5/18/2015 3:29:00 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD15-01454
| BLD-Foundation | 5/18/2015 | 5/18/2015 | 5/18/2015 3:18:11 PM | P | PASS |
|
|
Please call ahead - Early afternoon, pouring right after - Jason Phone #: ###-####
|
BLD14-00764
| BLD-Final | 5/15/2015 | 5/18/2015 | 5/18/2015 3:17:29 PM | P | NR |
|
|
Call with results - Blair Phone #: ###-####
|
BLD14-03660
| BLD-Wall Bracing | 5/18/2015 | 5/18/2015 | 5/18/2015 2:38:51 PM | P | FAIL |
|
|
plans are hanging inside the closet near the front door. Call Tim if any problems. Thank you much Phone #: ###-#### Inspection requested via web by Timothy Beaudoin. Missing hold downns, Shear nailing wrong CN posted
|
BLD15-01483
| BLD-Footing | 5/18/2015 | 5/18/2015 | 5/18/2015 1:47:06 PM | P | NR |
|
|
Phone #: ###-####
|
BLD15-01641
| BLD-Framing/Rough-in | 5/18/2015 | 5/18/2015 | 5/18/2015 1:46:18 PM | P | PASS |
|
|
Early afternoon if possible. Please call me to meet at the project. Thanks! Phone #: ###-#### Inspection requested via web by Gary Gettman
|
BLD14-03235
| BLD-Framing/Rough-in | 5/15/2015 | 5/18/2015 | 5/18/2015 11:56:20 AM | A | PASS |
|
|
Eric Phone #: ###-####
|
BLD14-03627
| BLD-Energy code compliance | 5/15/2015 | 5/18/2015 | 5/18/2015 10:54:57 AM | A | PASS |
|
|
Phone #: ###-####5
|
BLD15-00984
| BLD-Foundation | 5/15/2015 | 5/18/2015 | 5/18/2015 10:37:13 AM | A | PASS |
|
|
Wall; Eric Phone #: ###-####
|
BLD15-00629
| BLD-Wall Bracing | 5/15/2015 | 5/18/2015 | 5/18/2015 10:16:32 AM | A | PART |
|
|
Faulto Phone #: ###-####
|
ESC14-00980
| Site Final | 5/18/2015 | 5/18/2015 | 5/18/2015 10:15:31 AM | P | DONE |
|
|
|
ESC14-00980
| DOC - Permit Finaled | 5/18/2015 | 5/18/2015 | 5/18/2015 10:15:22 AM | P | PASS |
|
|
|
BLD14-03060
| BLD-Final | 5/15/2015 | 5/18/2015 | 5/18/2015 10:14:58 AM | A | PASS |
|
|
Dave Phone #: ###-####
|
BLD14-03060
| DOC - Permit Finaled | 5/18/2015 | 5/18/2015 | 5/18/2015 10:12:41 AM | P | PASS |
|
|
|