BLD16-00632
| BLD-Framing/Rough-in | 5/18/2016 | 5/18/2016 | 5/19/2016 11:00:16 AM | P | NR |
|
|
Please call ahead 30mins for access - Larry Phone #: ###-#### peprovalsnding plan mod a
|
BLD14-01987
| BLD-Framing/Rough-in | 5/18/2016 | 5/18/2016 | 5/18/2016 3:57:12 PM | P | FAIL |
|
|
Call 15 before // Mike Phone #: ###-####
|
BLD16-01013
| BLD-Final | 5/18/2016 | 5/18/2016 | 5/18/2016 2:14:01 PM | P | PASS |
|
|
Brad Phone #: ###-####
|
BLD16-01013
| DOC - Permit Finaled | 5/18/2016 | 5/18/2016 | 5/18/2016 2:13:18 PM | P | PASS |
|
|
|
BLD16-00452
| BLD-Wall Bracing | 5/18/2016 | 5/18/2016 | 5/18/2016 2:11:17 PM | P | PASS |
|
|
Yony Phone #: ###-#### c/n made ok
|
BLD16-01809
| BLD-Conference | 5/18/2016 | 5/18/2016 | 5/18/2016 2:10:01 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by mark bedard
|
BLD16-01809
| DOC - Permit Finaled | 5/18/2016 | 5/18/2016 | 5/18/2016 2:09:40 PM | P | PASS |
|
|
|
BLD15-04516
| BLD-Framing/Rough-in | 5/17/2016 | 5/18/2016 | 5/18/2016 1:30:45 PM | A | PASS |
|
|
Cameron Phone #: ###-#### cooller wall ok
|
MIS16-00156
| BLD-Conference | 5/17/2016 | 5/18/2016 | 5/18/2016 12:37:24 PM | A | FAIL |
|
|
structural work being done without permit c/n issued
|
BLD16-00730
| BLD-Footing | 5/17/2016 | 5/18/2016 | 5/18/2016 12:10:54 PM | A | PASS |
|
|
Tim Phone #: ###-####
|
BLD14-01830
| BLD-Framing/Rough-in | 5/17/2016 | 5/18/2016 | 5/18/2016 11:48:37 AM | A | PART |
|
|
Third floor framing inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith c/n posted ok to rc
|
BLD14-02741
| BLD-Wall cover | 5/17/2016 | 5/18/2016 | 5/18/2016 10:50:54 AM | A | PASS |
|
|
bathroom ceilings 2 ;3, north stair tower cover, 1st floor cover Phone #: ###-#### Inspection requested via web by Jim Carriveau
|