FIR16-00253
| INSP-Final Inspection | 5/17/2016 | 5/18/2016 | 5/18/2016 2:34:49 PM | P | CANC |
|
|
Rescheduled for tomorrow
|
NAF15-00043
| INSP-Sprinkler Rough-in/Hydro | 5/17/2016 | 5/18/2016 | 5/18/2016 2:32:14 PM | P | FAIL |
|
|
Test failed due to a split valve. Rescheduled for tomorrow
|
FIR16-00253
| INSP-Sprinkler Rough-in | 5/17/2016 | 5/18/2016 | 5/18/2016 2:30:09 PM | P | PASS |
|
|
insulation has been corrected. Piping can be covered.
|
FIR16-00283
| INSP-Final Inspection | 5/17/2016 | 5/18/2016 | 5/18/2016 11:26:25 AM | A | PASS |
|
|
Permit finaled. Hood suppression system functioned correctly
|
FIR16-00332
| INSP-Sprinkler Rough-in | 5/17/2016 | 5/18/2016 | 5/18/2016 9:15:13 AM | A | PASS |
|
|
Rough-in passed. Piping can be covered.
|
FIR13-00449
| INSP-Final Inspection | 5/17/2016 | 5/18/2016 | 5/18/2016 9:14:22 AM | A | PASS |
|
|
Permit finaled
|
FIR16-00268
| INSP-Sprinkler Rough-in | 5/17/2016 | 5/18/2016 | 5/18/2016 7:35:29 AM | A | PASS |
|
|
Work for phase 1 complete. Will need as-builts showing pipe routing changes as per discussion.
|