Inspections for the day of: Friday, May 18, 2018.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR17-00694 INSP-Sprinkler Rough-in5/17/20185/18/20185/18/2018 2:56:29 PMPPART
Rough in inspection for overhead fire sprinkler piping complete, rough in inspection for overhead fire sprinkler piping above hardlids complete, hardlids approved for cover. Notated city approved drawings where sway brace corrections are required.

The phone number provided is for Tom with CM Company. Our foreman on site is Troy, but he does not have a cell phone at the moment. Our office number is ###-#### if you have questions.
Thank you! Phone #: ###-#### Inspection requested via web by Stan Beus
BLD17-00972 FIRE-Final Inspection5/18/20185/18/20185/18/2018 2:53:34 PMPPASS
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete.

Jade Phone #: ###-####
FIR18-00090 INSP-Sprinkler Rough-in5/18/20185/18/20185/18/2018 11:11:16 AMPPASS
Rough to cover inspection for remaining overhead fire sprinkler piping in south open office area complete, complete area of work approved for cover.

Jordan Phone #: ###-####
FIR18-00299 INSP-Sprinkler Rough-in5/18/20185/18/20185/18/2018 11:10:08 AMAPASS
Rough to cover inspection for remaining overhead fire sprinkler piping in area of work complete, approved for cover.

Javier Phone #: ###-#### Inspection requested via web by Nathan Stenquist
FIR18-00125 INSP-Sprinkler Rough-in5/18/20185/18/20185/18/2018 11:09:27 AMAPART
Rough in inspection for overhead fire sprinkler piping partially complete, heads for elevator shaft to be installed at a later date, remaining pipin approved for cover.

. Phone #: ###-#### Inspection requested via web by Sam Ball
FIR18-00125 INSP-Sprinkler Rough-in/Hydro5/17/20185/18/20185/18/2018 11:08:34 AMADONE
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauge.

. Phone #: ###-#### Inspection requested via web by Sam Ball
FIR18-00086 INSP-Final Inspection5/17/20185/18/20185/18/2018 9:54:02 AMAPASS
Final fire alarm inspection for area of work complete.

Contact is Sean. Phone #: ###-#### Inspection requested via web by Morgan Ahten
BLD18-00828 FIRE-Final Inspection5/17/20185/18/20185/18/2018 12:00:00 AMACANC
Mike Phone #: ###-####