PLM04-01232
| Plumbing Rough-in | 5/18/2004 | 5/19/2004 | 5/19/2004 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 5/18/2004 at 8:42:08 AM. Contact: ###-####. gw to janitor sink ok will verify that ci is ok for the di or ro water going to waste to sink. 5/19/2004 12:03:42 PM
|
PLM04-00887
| Plumbing Rough-in | 5/18/2004 | 5/19/2004 | 5/19/2004 12:00:00 AM | A | PART |
|
|
allan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover everything except the shower valves that need to be pressure ballance and the 2 joints under the slab that need to be brazed. 5/19/2004 10:29:38 AM
|
PLM04-01312
| Sprinkler (Final) | 5/18/2004 | 5/19/2004 | 5/19/2004 12:00:00 AM | A | PASS |
|
|
###-#### Marie sp final ok 5/19/2004 12:26:02 PM
|
PLM04-00597
| Final | 5/18/2004 | 5/19/2004 | 5/19/2004 12:00:00 AM | A | PASS |
|
|
should be ready after 11am ; Phone #: ###-#### Internet Inspection Request from: RENEE CORNWALL final ok 5/19/2004 3:31:56 PM
|
PLM04-01195
| Final | 5/19/2004 | 5/19/2004 | 5/19/2004 12:00:00 AM | A | PASS |
|
|
shower, washer, final ok
|
PLM04-01167
| Other | 5/19/2004 | 5/19/2004 | 5/19/2004 12:00:00 AM | A | PART |
|
|
conference ok replace pvc in domestic water in boiler room and tunel and 2" waste to new sinks, shower valver are existing.
|
PLM04-01291
| Groundwork | 5/18/2004 | 5/19/2004 | 5/19/2004 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Sonja Hankel gw ok 5/19/2004 9:53:39 AM
|
PLM04-01311
| Groundwork | 5/18/2004 | 5/19/2004 | 5/19/2004 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 5/18/2004 at 4:55:03 PM. Contact: ###-####.
|
PLM04-01311
| Water and/or Sewer | 5/19/2004 | 5/19/2004 | 5/19/2004 12:00:00 AM | P | PASS |
|
|
sewer to future restroom ok to cover.
|
PLM04-01313
| Sprinkler (Final) | 5/18/2004 | 5/19/2004 | 5/19/2004 12:00:00 AM | P | PART |
|
|
###-#### Scott
|