Inspections for the day of: Friday, May 19, 2006.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-01223 BLD-Aging Inspection5/19/20065/19/20065/19/2006 4:45:14 PM CANC
Called Scott. Scott noted that owner was going to repair remaining items. He also noted that he would contact owner and have owner call me. Will reschedule inspection for Monday morning and issue a c/n if owner has not contacted me by friday 5:00pm.
BLD06-00632 BLD-Footing5/19/20065/19/20065/19/2006 3:15:23 PMPNR
dwayne; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Called in for interior column pad footings. rebar was not yet in place. Contractor needs to get geo-tech engineer to verify 3000psf soil bearing pressure of in place material. Special insp. for concrete is also required.
BLD06-00600 BLD-Final5/17/20065/19/20065/19/2006 2:52:39 PMPPASS
Scheduled by a contractor via Hello! on 5/17/2006 at 10:44:32 AM. Contact: ###-####. ok for perm occ. can not find the elec. permit.
BLD05-03237 BLD-Energy code compliance5/19/20065/19/20065/19/2006 1:56:06 PMPPASS
micheal; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD06-00565 BLD-Framing/Rough-in5/19/20065/19/20065/19/2006 1:39:13 PMPPASS
BEN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. All framing issues have been resolved.
BLD06-00565 BLD-Energy code compliance5/19/20065/19/20065/19/2006 1:38:43 PMPPASS
BEN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD06-01165 BLD-Final5/18/20065/19/20065/19/2006 12:08:08 PMAPASS
SCOTT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD06-01165 DOC - Permit Finaled5/19/20065/19/20065/19/2006 12:07:57 PMPPASS
BLD04-03025 BLD-Framing/Rough-in5/18/20065/19/20065/19/2006 10:48:51 AMACANC
Scheduled by a contractor via Hello! on 5/18/2006 at 3:49:20 PM. Contact: ###-####.
BLD06-00007 BLD-Footing5/18/20065/19/20065/19/2006 10:21:17 AMAFAIL
Scheduled by a contractor via Hello! on 5/18/2006 at 9:06:33 AM. Contact: ###-####. footing and column pad footings on grids 7.4 to 10 and grids aa.1 to aa.4. top rebar mats missing in the column pad footings. Special insp. to verify the install of all missing rebar.
BLD05-02607 BLD-Aging Inspection5/19/20065/19/20065/19/2006 10:18:45 AM PASS
Called allen with AMD and met on site with him. All work is complete. okl for cert of completion. Also inspected security office. ok.
BLD06-00335 BLD-Foundation5/19/20065/19/20065/19/2006 9:19:09 AMAPASS
Scheduled by a contractor via Hello! on 5/19/2006 at 6:57:40 AM. Contact: ###-####. Missing column pad fotings were placed.
BLD06-00805 BLD-Footing5/18/20065/19/20065/19/2006 9:08:14 AMAPART
Scheduled by a contractor via Hello! on 5/18/2006 at 3:50:52 PM. Contact: ###-####.wip
BLD06-00806 BLD-Footing5/18/20065/19/20065/19/2006 9:07:58 AMAPART
Scheduled by a contractor via Hello! on 5/18/2006 at 3:52:29 PM. Contact: ###-####.wip
BLD06-00808 BLD-Footing5/18/20065/19/20065/19/2006 9:07:38 AMAPART
Scheduled by a contractor via Hello! on 5/18/2006 at 3:54:03 PM. Contact: (208) 573-834wip
BLD05-02543 BLD-Aging Inspection5/19/20065/19/20065/19/2006 8:06:43 AM PASS
wip