ELE09-00394
| Electrical Rough-In | 5/18/2009 | 5/19/2009 | 5/19/2009 4:16:25 PM | P | PASS |
|
|
This is a rough ceiling inspection for Building A. Contact is Brian Cornell. Phone #: ###-#### Internet Inspection Request from: Richard Montgomery ceiling only ok to cover, met contractor
|
ESC08-00675
| General Inspection | 5/19/2009 | 5/19/2009 | 5/19/2009 4:10:37 PM | P | PASS |
|
|
looked ok
|
ESC09-00147
| General Inspection | 5/19/2009 | 5/19/2009 | 5/19/2009 4:09:53 PM | P | PASS |
|
|
looked ok
|
ESC08-00979
| General Inspection | 5/19/2009 | 5/19/2009 | 5/19/2009 4:09:17 PM | P | PASS |
|
|
looked ok
|
ELE09-00864
| Electrical Rough-In | 5/19/2009 | 5/19/2009 | 5/19/2009 4:04:03 PM | P | PASS |
|
|
Gene Phone #: ###-#### ric ok, no esc this project
|
ELE09-00836
| Permanent Service | 5/19/2009 | 5/19/2009 | 5/19/2009 3:28:32 PM | P | CANC |
|
|
This is to check the concrete encased electrode. If you have any questions, please call Clay. Thank You. Phone #: ###-#### Internet Inspection Request from: Clay Morgan called, wrong type request, see ri
|
ELE09-00836
| Electrical Rough-In | 5/19/2009 | 5/19/2009 | 5/19/2009 2:43:22 PM | P | PASS |
|
|
This is to check the concrete encased electrode. If you have any questions, please call Clay. Thank You. Phone #: ###-#### Internet Inspection Request from: Clay Morgan called, ok to pour concrete encased electrode
|
ELE08-01084
| Electrical Rough-In | 5/19/2009 | 5/19/2009 | 5/19/2009 2:41:08 PM | P | PART |
|
|
Xaiver- before 3 if possible- call prior to going Phone #: ###-#### ok to cover under floor cables only
|
ELE09-00801
| Electrical Rough-In | 5/19/2009 | 5/19/2009 | 5/19/2009 1:37:01 PM | P | FAIL |
|
|
eric - please call 1/2 hr prior Phone #: ###-#### met owner, gave corrections, NEC 210.52 (A) sjall add 2 receptacles for wall space, 300.4(A)&(D) edge of bored holes and nm cable shall be 1 1/4" from edge of framing members, no esc this project
|
ELE09-00451
| Electrical Rough-In | 5/18/2009 | 5/19/2009 | 5/19/2009 12:57:00 PM | P | PASS |
|
|
brandon Phone #: ###-#### ok to cover u/g for extended panel relocation, no esc this project
|
ELE07-02374
| Conference | 5/18/2009 | 5/19/2009 | 5/19/2009 10:15:22 AM | A | DONE |
|
|
andy - please call 1/2 hr prior Phone #: ###-#### reviewed service disconnect for garage or change panel to service rated panel, told owner building permit expired and that they to re-activate
|
ELE08-02776
| Electrical Rough-In | 5/18/2009 | 5/19/2009 | 5/19/2009 9:49:20 AM | A | PASS |
|
|
Jim- unit 533 Phone #: ###-#### ric ok, no esc this project
|
ELE09-00659
| Final | 5/18/2009 | 5/19/2009 | 5/19/2009 9:14:52 AM | A | PASS |
|
|
Rod Phone #: ###-#### ok to final, no esc this project
|
ELE09-00668
| Electrical Rough-In | 5/18/2009 | 5/19/2009 | 5/19/2009 8:34:49 AM | A | FAIL |
|
|
Ceiling inspection for cover Phone #: ###-#### Internet Inspection Request from: Celinda Winters called left message, left correction notice, NEC 210.62 Shall provide show room receptacles, 300.11(A) cables and raceways shall not be supported by ceiling grids, 110.16 shall provide arc flash warnings at service disconnect
|
ELE09-00668
| Permanent Service | 5/18/2009 | 5/19/2009 | 5/19/2009 8:21:08 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Celinda Winters p/s exst meter pak n ok , no esc this project
|