FIR07-00086
| INSP-Final Inspection | 5/19/2009 | 5/19/2009 | 5/20/2009 9:55:25 AM | P | PASS |
|
|
Permit finaled.
|
FIR09-00126
| INSP-Final Inspection | 5/19/2009 | 5/19/2009 | 5/19/2009 3:48:23 PM | P | PASS |
|
|
Permit finaled
|
FIR05-00508
| INSP-Final Inspection | 5/19/2009 | 5/19/2009 | 5/19/2009 3:35:57 PM | P | PASS |
|
|
Permit finaled
|
BLD09-00105
| FIRE-Final Inspection | 5/19/2009 | 5/19/2009 | 5/19/2009 3:29:41 PM | P | PASS |
|
|
Life safety passed.
|
FIR08-00679
| INSP-Alarm Testing | 5/19/2009 | 5/19/2009 | 5/19/2009 3:29:05 PM | P | FAIL |
|
|
Resubmittals are required due to addressable notification devices installed instead of the standard devices. Also the smoke detectors model shown on the plans is not what has been installed. The initiating devices in the elevator shaft have been deleted per the state elevator inspector per brian with simplex. As-builts were on site but did not match the installation. The strobes on the second floor exterior balcony need modified to provide correct coverage. The manual pull station in the first floor lobby is mounted too high. The items tested that passed are phone lines, battery trouble, loss of a/c and the smoke detector over the facp. These signals were received at the central station. I request a manometer test of the duct smoke detectors on the first floor due to questionable positioning in the ducting.
|
FIR08-00675
| INSP-Sprinkler Rough-in/Hydro | 5/19/2009 | 5/19/2009 | 5/19/2009 3:23:37 PM | P | CANC |
|
|
Canceled due to the project related fire alarm system/permit not being complete. The backflow preventor has been certified. The fire alarm interconnections need to be tested/verified for final.
|
BLD09-00401
| FIRE-Final Inspection | 5/19/2009 | 5/19/2009 | 5/19/2009 1:38:29 PM | P | PASS |
|
|
life safety passed.
|
FIR08-00786
| INSP-Alarm Testing | 5/18/2009 | 5/19/2009 | 5/19/2009 1:37:58 PM | P | CANC |
|
|
Cancelled per conversation with Mark.
|
FIR09-00282
| INSP-Sprinkler Rough-in | 5/19/2009 | 5/19/2009 | 5/19/2009 1:37:28 PM | P | PASS |
|
|
The 2" underground supply piping is ok to cover. The contractor did not have the original approved plans, just copies, on site. I let him know those would be needed at the next inspection.
|
FIR09-00248
| INSP-Sprinkler Rough-in | 5/19/2009 | 5/19/2009 | 5/19/2009 1:37:00 PM | P | PASS |
|
|
The 2" underground supply piping is ok to cover. The contractor did not have the original approved plans, just copies, on site. I let him know those would be needed at the next inspection.
|
FIR09-00255
| INSP-Sprinkler Rough-in | 5/18/2009 | 5/19/2009 | 5/19/2009 12:35:46 PM | A | PASS |
|
|
The 2" underground supply piping is ok to cover. The contractor did not have the original approved plans, just copies, on site. I let him know those would be needed at the next inspection.
|
FIR06-00881
| INSP-Final Inspection | 5/19/2009 | 5/19/2009 | 5/19/2009 10:48:18 AM | P | PASS |
|
|
Permit finaled
|
FIR08-00720
| FIR-Aging Inspection | 5/19/2009 | 5/19/2009 | 5/19/2009 9:25:42 AM | | NR |
|
|
Work is in progress.
|
FIR09-00294
| INSP-Final Inspection | 5/15/2009 | 5/19/2009 | 5/19/2009 9:07:41 AM | A | PASS |
|
|
Permit finaled
|
FIR05-00750
| INSP-Final Inspection | 5/15/2009 | 5/19/2009 | 5/19/2009 9:07:21 AM | A | CANC |
|
|
To be rescheduled per discussion with Guy.
|