Inspections for the day of: Wednesday, May 19, 2010.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00349 INSP-Conference5/13/20105/19/20105/20/2010 12:31:48 PMADONE
Per jeff this work has been covered by the new FIR permit for this business. Work will be verified at the next sprinkler inspection for the new permit.
FIR04-00063 INSP-Conference5/13/20105/19/20105/20/2010 12:15:38 PMADONE
Per Jeff this one is on the top of his list of items to address.
FIR09-00708 INSP-Final Inspection5/19/20105/19/20105/20/2010 11:32:55 AMPFAIL
Todays inspection was for the two north most corridors and the residence rooms associated with them. All items were ok except quite a few canopies are falling off of the pendant heads. Lonnie said he would address the issue.
BLD08-01847 FIRE-Final Inspection5/18/20105/19/20105/19/2010 2:30:39 PMPPASS
Life safety passed.
FIR10-00208 INSP-Final Inspection5/18/20105/19/20105/19/2010 2:12:22 PMPPASS
permit finaled
FIR10-00148 INSP-Final Inspection5/18/20105/19/20105/19/2010 2:11:36 PMPPASS
Permit finaled
FIR03-00510 INSP-Conference5/12/20105/19/20105/19/2010 10:40:31 AMADONE
I spoke to Bob and he stated that he is in the process on putting together drawings and doing some on site investigating. I set up follow up inspections for next week.
FIR04-00374 INSP-Conference5/12/20105/19/20105/19/2010 10:39:54 AMADONE
I spoke to Bob and he stated that he is in the process on putting together drawings and doing some on site investigating. I set up follow up inspections for next week.
FIR04-00375 INSP-Conference5/12/20105/19/20105/19/2010 10:39:21 AMADONE
I spoke to Bob and he stated that he is in the process on putting together drawings and doing some on site investigating. I set up follow up inspections for next week.
FIR03-00381 INSP-Conference5/12/20105/19/20105/19/2010 10:38:41 AMADONE
I spoke to Bob and he stated that he is in the process on putting together drawings and doing some on site investigating. I set up follow up inspections for next week.
FIR10-00134 INSP-Final Inspection5/18/20105/19/20105/19/2010 10:25:49 AMAFAIL
A/v's are overspaced in a conference room, an hvac unit needs to be tested and the large outdoor hvac unit has not been connected to the facp yet. No testing was performed.
FIR10-00133 INSP-Final Inspection5/18/20105/19/20105/19/2010 10:23:00 AMAFAIL
No inspection was performed since the scope of work has changed by the focus rooms not being installed. Plans will need to be submitted showing the modified scope of work.
BLD09-00945 FIRE-Final Inspection5/18/20105/19/20105/19/2010 10:19:57 AMAPART
Phase 9 life safety passed. The two exit signs have been installed.
FIR10-00132 INSP-Final Inspection5/18/20105/19/20105/19/2010 10:01:12 AMAFAIL
The duct smoke detectors did not set off the a/v's and the two 30cd in the conference room are overspaced off of the west wall.
BLD09-02235 FIRE-Final Inspection5/18/20105/19/20105/19/2010 9:56:17 AMAPASS
life safety passed
BLD10-00756 FIRE-Final Inspection5/18/20105/19/20105/18/2010 2:30:50 PMAPASS
Life safety passed.