FIR13-00308
| INSP-Sprinkler Rough-in | 5/16/2014 | 5/19/2014 | 5/19/2014 4:06:42 PM | P | PART |
|
|
Inspection for modifications at the 1st and 2nd floor existing adjacent office and breakroom areas. This work to be shown on revised drawings per discussion.
|
BLD14-00150
| FIRE-Final Inspection | 5/19/2014 | 5/19/2014 | 5/19/2014 4:01:35 PM | P | PASS |
|
|
Derek-please 1/2 hr prior Phone #: ###-####
|
FIR14-00124
| INSP-Final Inspection | 5/19/2014 | 5/19/2014 | 5/19/2014 3:53:18 PM | P | NR |
|
|
|
BLD13-03384
| FIRE-Final Inspection | 5/16/2014 | 5/19/2014 | 5/19/2014 12:25:09 PM | A | PEND |
|
|
Pending plan modification and permit related FIR trade work.
|
FIR14-00229
| INSP-Final Inspection | 5/18/2014 | 5/19/2014 | 5/19/2014 12:23:38 PM | A | PART |
|
|
Final pending water supply for verification of waterflow switch function. Remainder of fire alarm work tested satisfactory including tampers, MP, FACP, RA, trouble conditions, offsite monitoring, etc. Noted a heat detector at the panel has been installed in place of a SD due to adjacent equipment.
|
BLD14-00725
| FIRE-Final Inspection | 5/16/2014 | 5/19/2014 | 5/19/2014 10:48:07 AM | A | FAIL |
|
|
Need to repair one EM light, secure open light fixture wiring at the storage room, repair exit sign at the west exit. Hood suppression system modifications are in process and will require a permit and inspection prior to final. Project finishes underway.
|
FIR14-00251
| INSP-Final Inspection | 5/16/2014 | 5/19/2014 | 5/19/2014 10:16:19 AM | A | PART |
|
|
Overhead fire sprinkler system modifications and additions at the first floor and mezzanine levels passed rough-in- Okayed for cover.
|