Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00076 INSP-Sprinkler Rough-in5/19/20145/19/20145/19/2014 3:21:32 PMPPASS
Piping above the lay in ceilings on the first and second floors is ok to cover
BLD14-00571 FIRE-Final Inspection5/19/20145/19/20145/19/2014 3:20:23 PMPPASS
Life safety passed.
FIR14-00213 INSP-Final Inspection5/19/20145/19/20145/19/2014 2:41:34 PMPPASS
permit finaled
FIR14-00287 INSP-Sprinkler Rough-in5/19/20145/19/20145/19/2014 2:12:17 PMPFAIL
Called the contact and spoke to Mike. He was going to call Brian and let him know I would be there this afternoon. I showed up at job site and did not see Brian here and could not find any city approved plans. I noted that both buildings that have underground piping currently installed do not meet the depth requirments of 4'-6".

This is an ug depth to bury. Mike B is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
BLD13-02473 FIRE-Final Inspection5/16/20145/19/20145/19/2014 10:46:57 AMAPASS
life safety passed
FIR14-00175 INSP-Final Inspection5/14/20145/19/20145/19/2014 10:46:39 AMAPASS
permit finaled
FIR14-00156 INSP-Final Inspection5/14/20145/19/20145/19/2014 10:45:59 AMAPASS