BLD16-00464
| FIRE-Conference | 5/19/2016 | 5/19/2016 | 5/19/2016 3:07:58 PM | P | DONE |
|
|
Discussed address numbers and door sticker with Katie.
|
BLD15-04491
| FIRE-Final Inspection | 5/18/2016 | 5/19/2016 | 5/19/2016 3:07:04 PM | P | PASS |
|
|
life safety passed
|
FIR16-00335
| INSP-Supply line flush | 5/19/2016 | 5/19/2016 | 5/19/2016 1:51:55 PM | P | NR |
|
|
I met Jim Danes and Chad at the job site and discussed what I needed to see and how they wanted to accomplish that. Looks like they will center load the pipe then hydro and then flush.
|
FIR16-00303
| INSP-Sprinkler Rough-in | 5/19/2016 | 5/19/2016 | 5/19/2016 1:43:56 PM | P | CANC |
|
|
Cancel per Jim
|
FIR16-00253
| INSP-Final Inspection | 5/18/2016 | 5/19/2016 | 5/19/2016 1:35:33 PM | A | FAIL |
|
|
Tile been installed yet.
|
NAF15-00043
| INSP-Sprinkler Rough-in/Hydro | 5/19/2016 | 5/19/2016 | 5/19/2016 12:54:59 PM | P | FAIL |
|
|
Overhead hydro failed again due to loss of pressure
|
NAF15-00043
| INSP-Sprinkler Rough-in/Hydro | 5/18/2016 | 5/19/2016 | 5/19/2016 11:12:40 AM | A | FAIL |
|
|
Overhead hydro failed due to visible loss of pressure at the guage.
|
BLD16-01451
| FIRE-Final Inspection | 5/18/2016 | 5/19/2016 | 5/19/2016 10:41:08 AM | A | FAIL |
|
|
Provide bi-annual inspection for the hood suppression system and replace the painted sprinkler pendants at the Service Counter.
|
BLD14-02837
| FIRE-Final Inspection | 5/18/2016 | 5/19/2016 | 5/19/2016 9:42:47 AM | A | FAIL |
|
|
The most up to date plans were not on site and neither were the small documents.
|
NAF16-00013
| INSP-Final | 5/18/2016 | 5/19/2016 | 5/19/2016 8:42:56 AM | A | CANC |
|
|
Not ready for a final yet due to another contractor installing a wireless dialer
|
NAF16-00013
| INSP-Final | 5/18/2016 | 5/19/2016 | 5/18/2016 7:59:55 AM | P | CANC |
|
|
Primary Health Garden City Afternoon if possible Please contact Ken Webster Phone #: ###-#### >> Inspection requested via web by Ken Webster Inspection cancelled from web by: Ken Webster
|