Inspections for the day of: Thursday, May 19, 2016.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-00923 BLD-Aging Inspection5/19/20165/19/20165/20/2016 2:05:22 PM PASS
BLD14-03071 BLD-Framing/Rough-in5/19/20165/19/20165/20/2016 1:34:08 PMPFAIL
Work in progress on 1st, 2nd and 3rd. floors. Needs to fireblock fur downs, Provide the hat channel and additional layer of 5/8 type x rock to complete the floor ceiling assembly above fur downs. Provide 5/8 type x rock behind tub/shower stalls. Needs to box out washer boxes as well.
BLD14-03071 BLD-Wall Bracing5/19/20165/19/20165/20/2016 1:29:22 PMPFAIL
Needs to install all exterior and interior floor to floor straps, complete the sheating from interior shear walls on 3rd floor to underneath side of roof deck and provide the kicker supprts as per the approved plans. Also noted ares on interior shear walls not yet attached.
BLD15-04490 BLD-Framing/Rough-in5/19/20165/19/20165/19/2016 4:54:41 PMPDEFR
Shell Framing Inspection Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD16-00672 BLD-Foundation5/19/20165/19/20165/19/2016 4:07:06 PMPPASS
Kay Phone #: ###-####
BLD16-01160 BLD-Framing/Rough-in5/19/20165/19/20165/19/2016 2:06:24 PMPFAIL
Phone #: 2085015747 >> Inspection requested via mobile web by Tom. Complete lateral bracing on T02 truss. Complet nailing off web of 2ply T15 truss per the truss engineering. Foam seal top plate and OSB at gas pipe penetration. Provide purlin on either side og T12A trusses on top chord twords heel were sheathing has been left short. Need additional blocking on hangars on two T12 trusses to comply with hangar listing. Correction notice issued. Ok to insulate.
BLD16-00926 BLD-Conference5/19/20165/19/20165/19/2016 1:02:32 PMPDONE
stop by project to check on progress, all MEP rough in inspections are completed. Framing is completed and majority covered. Also noted clearance issue with restroom door, side approach latch side, pull. Aslo noted elevated platform constructed that is not on plans. Tenant is removing some shhet rock for inspection, moving door to meet min clearance and will insulate under platform and then call in for frming inspection.
BLD16-00109 BLD-Wall Bracing5/19/20165/19/20165/19/2016 12:45:57 PMPPASS
Brett Phone #: ###-####
BLD14-03071 BLD-Framing/Rough-in5/18/20165/19/20165/19/2016 12:44:10 PMACANC
Pat Phone #: ###-####-please call prior to meet. Moved to pm.
BLD16-00591 BLD-Ceiling Grid Inspection5/19/20165/19/20165/19/2016 10:56:40 AMANR
Mike, Can we get a partial inspection for the front sales area grid (large portion) as we are waiting for a light for the hallway back in the rear. We do have approval to cover from electrical on that section. Phone #: ###-#### Inspection requested via web by Andrew George. Still needs mech. and fire sprinkler rough in inspections.
BLD15-03823 BLD-Final5/18/20165/19/20165/19/2016 10:01:27 AMAPASS
Hamish Phone #: ###-####. All issues resolved. Ok for perm occ.
BLD16-01327 BLD-Final5/18/20165/19/20165/19/2016 9:43:10 AMAPASS
Vera Phone #: ###-####
BLD16-01327 DOC - Permit Finaled5/19/20165/19/20165/19/2016 9:42:50 AMPPASS
BLD16-00451 BLD-Final5/18/20165/19/20165/19/2016 9:25:39 AMAPASS
James Phone #: ###-####. Issue resolved. ok for perm occ.
BLD14-03179 BLD-Final5/18/20165/19/20165/19/2016 8:32:05 AMAPASS
Please call in advance. Thx. Phone #: ###-#### Inspection requested via web by Scott Zierler
BLD14-03179 DOC - Permit Finaled5/19/20165/19/20165/19/2016 8:31:48 AMPPASS
BLD14-03178 BLD-Final5/18/20165/19/20165/19/2016 8:31:00 AMAPASS
Please call in advance. Thx. Phone #: ###-#### Inspection requested via web by Scott Zierler
BLD14-03178 DOC - Permit Finaled5/19/20165/19/20165/19/2016 8:30:29 AMPPASS