Inspections for the day of: Friday, May 19, 2017.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrandon Shaw
TitleBLD-COM/RES INSPECTOR
Phone #208-954-9358
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-03960 BLD-Final5/19/20175/19/20175/19/2017 4:59:56 PMPNH
Andreana Phone #: ###-####
Both Mech permits still open at time of inspection, 1300 hrs.
BLD17-00940 BLD-Foundation5/19/20175/19/20175/19/2017 4:58:20 PMPPASS
Sergio Phone #: ###-####
BLD17-00391 BLD-Wall Bracing5/18/20175/19/20175/19/2017 4:57:38 PMAPASS
Phone #: ###-#### Inspection requested via web by Jaysen Porter
BLD16-03905 BLD-Wall Bracing5/18/20175/19/20175/19/2017 4:57:12 PMAPASS
Shear // Frank or ###-#### Carlos Phone #: ###-####
BLD17-00622 BLD-Framing/Rough-in5/19/20175/19/20175/19/2017 2:38:01 PMPPART
Nancy Phone #: ###-####
1) Grider truss in garage needs bearing to foundation.
2) Garage header missing jack studs, right side door
3) Missing beam at left side back porch.
OK to insulate
BLD17-00946 BLD-Framing/Rough-in5/19/20175/19/20175/19/2017 12:31:42 PMPPASS
Hi Tony. Can you make it just before noon? Phone #: ###-#### Inspection requested via web by Tim Bergey
BLD16-02989 BLD-Final5/17/20175/19/20175/19/2017 11:18:35 AMAPASS
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD16-02989 DOC - Permit Finaled5/19/20175/19/20175/19/2017 11:18:12 AMPPASS
BLD17-01314 BLD-Conference5/18/20175/19/20175/19/2017 9:19:43 AMADONE
Call 30 min before // Duane Phone #: ###-####
Talked with contractor, removing old bearing point pad in crawl, west end, adding new 30" X 30" pad for new post.