FIR20-00139
| INSP-Final Inspection | 5/18/2020 | 5/19/2020 | 5/19/2020 2:17:54 PM | P | CANC |
|
|
Rescheduled for 20MAY2020 for completion of walkthrough items, this request is cancelled.
Phone #: ###-#### Inspection requested via web by Ken Webster
|
FIR20-00352
| INSP-Final Inspection | 5/19/2020 | 5/19/2020 | 5/19/2020 2:14:06 PM | P | FAIL |
|
|
Hood suppression system did not function with test like cut, hood activation did function with manual pull station, hood suppression system reported to fire panel.
2pm if possible. thanks for everything! youre great! Phone #: ###-#### Inspection requested via web by Don Kartchner
|
FIR20-00331
| INSP-Sprinkler Rough-in | 5/18/2020 | 5/19/2020 | 5/19/2020 2:12:47 PM | P | PASS |
|
|
Scope of work has been completed, cover is approved.
Cover inspection for UG. Please call Troy Nelson with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
FIR19-00623
| INSP-Sprinkler Rough-in | 5/18/2020 | 5/19/2020 | 5/19/2020 12:25:38 PM | P | CANC |
|
|
Cancelled per conversation with point of contact, inspection was scheduled for 20MAY2020.
This is rough in for main building overhead. Please call Rick Fry with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
FIR20-00139
| INSP-Final Inspection | 5/19/2020 | 5/19/2020 | 5/19/2020 12:23:50 PM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Ken Webster: Coordinated for 9AM with Jim Page
|
FIR20-00183
| INSP-Final Inspection | 5/19/2020 | 5/19/2020 | 5/19/2020 12:22:24 PM | P | PASS |
|
|
Final fire alarm inspection for scope of work is complete.
contact Jeff ###-#### when you get to B17C lobby Inspection requested via web by Jeff Roberts
|
FIR20-00139
| INSP-Final Inspection | 5/19/2020 | 5/19/2020 | 5/19/2020 11:10:51 AM | A | CANC |
|
|
Inpsection request was for a conference, this request is cancelled.
|
FIR20-00139
| INSP-Conference | 5/19/2020 | 5/19/2020 | 5/19/2020 11:09:20 AM | A | DONE |
|
|
Performed walkthrough, items noted are: Strobes in gym lobby show 30cd on city approved plans, ceiling exceeds 20 feet, strobes will have to be increased. Nurses station strobe is overspaced plus one will need to be added for laydown area coverage. Kitchen hood causes coverage issues in kitchen area, stobe will need to be added for proper coverage. Device in mail room is overspaced, candela will need to be increased for proper coverage or relocate device. East corridor by stairs exceeds 20 feet, candela setting at 30cd does not provide proper coverage, candella will be increased to 75cd. Items noted will need to be reflected on city approved drawings before permit can be finaled.
|
FIR19-00489
| INSP-Final Inspection | 5/18/2020 | 5/19/2020 | 5/19/2020 9:47:40 AM | P | PASS |
|
|
Final fire sprinkler inspection is complete.
Todd Ketterling is the contact. Thanks so much! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR20-00269
| INSP-Final Inspection | 5/14/2020 | 5/19/2020 | 5/19/2020 9:42:09 AM | A | CANC |
|
|
Cancelled per conversation with point of contact, inspection will be rescheduled for a later date.
Capitol Terrace Power supplies: 616315720 Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
FIR19-00935
| INSP-Final Inspection | 5/14/2020 | 5/19/2020 | 5/19/2020 9:41:55 AM | A | CANC |
|
|
Cancelled per conversation with point of contact, inspection will be rescheduled for a later date.
Please call 30 minutes prior to tech. Phone #: ###-#### Inspection requested via web by Kristin Dolan
|