PLM96-00579
| INSP - Plumbing Rough-in | 5/2/1996 | 5/2/1996 | 5/2/1996 12:00:00 AM | | PART |
|
|
/ / 347 - DRY FIT INSPECTION ONLY TOLD TO GLUE DRAINS 5/2/6 347
|
PLM96-00645
| INSP - Final | 5/2/1996 | 5/2/1996 | 5/2/1996 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 2 BASIN 2 TUB 2 SINK 1 W/B 1 W/H 1 FINAL O/K 5/2/6 347
|
PLM96-01105
| INSP - Sewer and Water lines | 5/2/1996 | 5/2/1996 | 5/2/1996 12:00:00 AM | | PASS |
|
|
/ / 347 - S&W O/K 5/2/6 347
|
PLM96-01107
| INSP - Plumbing Rough-in | 5/2/1996 | 5/2/1996 | 5/2/1996 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 2 BASIN 2 TUB 2 W/B 1 W/H 1 SINK 1 R/I O/K 5/2/6 347
|
PLM96-01109
| INSP - Sprinkler & Backflow | 5/2/1996 | 5/2/1996 | 5/2/1996 12:00:00 AM | | PASS |
|
|
/ / 347 - 2 BACKFLOW PREVENTORS O/K 5/2/6 347
|
PLM96-01110
| INSP - Plumbing Rough-in | 5/2/1996 | 5/2/1996 | 5/2/1996 12:00:00 AM | | PASS |
|
|
/ / 347 - k/s 1 R/I O/K 5/2/6
|
PLM96-01116
| INSP - Sprinkler & Backflow | 5/2/1996 | 5/2/1996 | 5/2/1996 12:00:00 AM | | PASS |
|
|
/ / 347 -
|
PLM96-01117
| INSP - Plumbing Rough-in | 5/1/1996 | 5/2/1996 | 5/2/1996 12:00:00 AM | A | PASS |
|
|
|
PLM96-01119
| INSP - Sewer and Water lines | 5/2/1996 | 5/2/1996 | 5/2/1996 12:00:00 AM | P | PASS |
|
|
05/02/96 347 - S7W O/K 5/2/6 347
|
PLM96-01121
| INSP - Ground work | 5/2/1996 | 5/2/1996 | 5/2/1996 12:00:00 AM | P | PASS |
|
|
05/02/96 347 - READY AT 2:00 BACKWATER VALVE REQUIRED G/W O/K 5/2/6 347
|
PLM96-01122
| INSP - Sprinkler & Backflow | 5/2/1996 | 5/2/1996 | 5/2/1996 12:00:00 AM | P | PASS |
|
|
05/02/96 347 - SP. O/K 5/2/6 347
|
PLM96-01115
| INSP - Sprinkler & Backflow | 5/2/1996 | 5/2/1996 | 5/2/1996 12:00:00 AM | P | PASS |
|
|
05/02/96 347 - SP O/K 5/2/6 347
|
PLM96-00731
| INSP - Final | 5/2/1996 | 5/2/1996 | 5/2/1996 12:00:00 AM | P | PASS |
|
|
05/02/96 347 - FINAL OK 5/2/6 347
|
PLM96-00909
| INSP - Plumbing Rough-in | 5/2/1996 | 5/2/1996 | 5/2/1996 12:00:00 AM | P | PASS |
|
|
05/02/96 347 - 11 FIXTURES W/C 2 BASIN 3 TUB 1 SHR 1 SINK 1 W/B 1 W/H 1 R/I O/K 5/2/6 347
|
PLM96-01046
| INSP - Plumbing Rough-in | 5/2/1996 | 5/2/1996 | 5/2/1996 12:00:00 AM | P | PASS |
|
|
05/02/96 347 - READY AT 4:00 R/I O/K 5/2/6 IF STRIP MALL IS NOT PROTEC BACKFLOW A DOUBLE CHECK WILL BE REQUIRED BEFORE FINAL CAN BE ISSUED. DEBEST WILL CHECK 347
|