ELE00-01523
| Permanent Service | 5/1/2000 | 5/2/2000 | 5/2/2000 12:00:00 AM | P | PASS |
|
|
after 3:00\\###-#### P/S O/H reconnect ok 5/3/00 3:34:01 PM
|
ELE00-01362
| Electrical Rough-In | 5/2/2000 | 5/2/2000 | 5/2/2000 12:00:00 AM | P | PASS |
|
|
###-####--barabara re-insp r/i Corrections completed per J. Frank ele. R/I 5/3/00 3:32:33 PM
|
ELE99-01707
| Electrical Rough-In | 5/2/2000 | 5/2/2000 | 5/2/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/02/2000 at 08:51:33. Contact: ###-####. 2nd floor room #216 ele. R/I walls. 5/3/00 3:32:04 PM
|
ELE00-00149
| Electrical Rough-In | 5/2/2000 | 5/2/2000 | 5/2/2000 12:00:00 AM | P | PASS |
|
|
###-#### 3rd floor Ok cover walls in 3rd floor bathrooms lobby area. 5/3/00 3:32:46 PM
|
ELE00-01367
| Electrical Rough-In | 5/2/2000 | 5/2/2000 | 5/2/2000 12:00:00 AM | P | PASS |
|
|
conference Dane ###-#### Conference with Dany Meyer- NEC 300-21; all wiring in air plenum shall be fire rated. 5/3/00 3:35:28 PM
|
ELE99-01865
| Final | 5/2/2000 | 5/2/2000 | 5/2/2000 12:00:00 AM | P | PASS |
|
|
###-#### pager Completed 5th floor. 5/3/00 3:32:18 PM
|
ELE00-01546
| Electrical Rough-In | 5/2/2000 | 5/2/2000 | 5/2/2000 12:00:00 AM | P | PART |
|
|
conference with Micheal Hyde ###-#### please call one hour before so that he can meet you out there.... Conference discussed service panel. 5/3/00 3:31:49 PM
|