ELE01-01414
| Final | 5/1/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | A | PASS |
|
|
Dennis ###-#### back door is open ok 5/2/2001 9:07:21 AM
|
ELE01-00177
| Final | 5/1/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 16:13:47. Contact: ###-####. ok 5/2/2001 1:16:17 PM
|
ELE01-00268
| Final | 5/1/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 16:14:48. Contact: ###-####. ok 5/2/2001 1:16:30 PM
|
ELE01-01108
| Final | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | P | FAIL |
|
|
george ###-#### reinspection fail called needs to install GEC under acorn clamp, per manufactures instructions states 5/2/2001 4:40:50 PM
|
ELE00-00489
| Electrical Rough-In | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 315 On 5/2/2001 2:19:48 PM conference with John of Romar and Steed Const clearence for service gear that was added to original service gear ok 5/2/2001 3:36:53 PM
|
ELE01-01108
| Permanent Service | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 315 On 5/2/2001 4:38:17 PM p/s o/h new ok 5/2/2001 4:41:19 PM
|