MEC01-01278
| Pressure Test | 5/1/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC01-01278
| Rough-in | 5/1/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | A | FAIL |
|
|
c/n posted 5/2/2001 10:04:53 AM
|
MEC01-01278
| Final | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 07:27:52. Contact: ###-####.
|
MEC01-01246
| Rough-in | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC00-03410
| Rough-in | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | P | FAIL |
|
|
1st floor roof and the basement steve ###-#### c/n posted 5/2/2001 2:33:11 PM
|
MEC00-03059
| Rough-in | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | P | FAIL |
|
|
2nd floor and roof steve ###-#### c/n posted 5/2/2001 2:36:27 PM
|
MEC01-01250
| Pressure Test | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC01-00345
| Final | 5/1/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 15:29:07. Contact: ###-####. done by 411 5/2/2001 2:37:05 PM
|