BLD00-03047
| BLD-Final | 5/1/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 15:38:20. Contact: ###-####.... ok to sign at office for l/c...cant find card at site 5/2/2001 5:11:22 PM
|
BLD01-00452
| BLD-Framing/Rough-in | 5/1/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | A | PART |
|
|
###-#### please call first 15 min. prior to meet there...conf w/ eng'r re 5/2/2001 12:40:30 PM c/n...holes at beam 5/2/2001 12:40:47 PM
|
BLD99-03148
| BLD-Framing/Rough-in | 5/1/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | A | PART |
|
|
###-####, rec'd submittal for mod. at ADA rest rm at bsmt...& alternate 1hr lid assy. (UL) 5/2/2001 12:00:59 PM
|
BLD99-03303
| BLD-Conference | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 5/2/2001 10:28:28 AM need submittals for modification / completion deleting some features of job for review.
|
BLD01-00141
| BLD-Final | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 09:47:48. Contact: ###-####....need verify cdhd 5/2/2001 5:35:14 PM
|
BLD01-00379
| BLD-Conference | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 5/2/2001 5:14:05 PM w/ Concrete contractor...need spec insp, too.
|
BLD00-01649
| BLD-Framing/Rough-in | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | P | PART |
|
|
Mil ###-####; 4th/ 5th fl curtain wall firestops ok; Need shafts for hvac-exhaust from 3rd fl at areas2,3 , and as req'd...compleat main 2hr shafts through out, replace core bd as needed due to damage 5/3/2001 4:38:59 PM 5/3/2001 4:40:57 PM
|
BLD00-03569
| BLD-Footing | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | P | PART |
|
|
Darrell ###-####...ftgs, pour at own risk , pend soils report 5/2/2001 5:28:13 PM
|