BLD00-02884
| BLD-Framing/Rough-in | 4/30/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | A | PART |
|
|
ext. shear ok to cover 5/2/2001 10:19:29 AM
|
BLD00-02884
| BLD-Framing/Rough-in | 4/30/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | A | PART |
|
|
ext. shear ok to cover 5/2/2001 10:19:29 AM
|
BLD00-03347
| BLD-Conference | 5/1/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | A | PASS |
|
|
conference
ok for permanent occupancy 5/2/2001 10:59:44 AM
|
MEC01-01151
| Final | 5/1/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 16:19:17. Contact: .
r/i ok 5/2/2001 10:17:45 AM
|
MEC01-01151
| Final | 5/1/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 16:19:17. Contact: .
r/i ok 5/2/2001 10:17:45 AM
|
MEC01-00479
| Rough-in | 5/1/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 16:21:39. Contact: .
bath vents, pressure test, radiant floor ok 5/2/2001 10:18:44 AM
|
MEC01-00479
| Rough-in | 5/1/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 16:21:39. Contact: .
bath vents, pressure test, radiant floor ok 5/2/2001 10:18:44 AM
|
BLD00-03619
| BLD-Final | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 07:22:32. Contact: ###-####.
|
BLD00-03619
| BLD-Final | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 07:22:32. Contact: ###-####.
|
BLD01-00671
| BLD-Conference | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | P | PASS |
|
|
mike- ###-#### for conf
conf. on egress. ok to turn sideways 5/2/2001 4:25:31 PM
|
BLD01-00907
| BLD-Framing/Rough-in | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | P | PART |
|
|
shear wall Anthony ###-####
ext. shear ok 5/2/2001 2:46:56 PM
|
BLD01-01113
| BLD-Footing | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 08:49:15. Contact: ###-####.verbal corrections 5/2/2001 3:02:12 PM
|
BLD01-00587
| BLD-Framing/Rough-in | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | P | PART |
|
|
###-####
c/n posted, ok to insulate after trades are signed off 5/2/2001 1:04:48 PM
|
BLD01-00235
| BLD-Framing/Rough-in | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | P | PART |
|
|
###-####
c/n posted, ok to insulate 5/2/2001 2:30:20 PM
|
BLD01-00171
| BLD-Conference | 5/2/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 07:16:46. Contact: ###-####.
conference on special inspections 5/2/2001 3:45:37 PM
|
BLD01-00106
| BLD-Footing | 5/1/2001 | 5/2/2001 | 5/2/2001 12:00:00 AM | P | PART |
|
|
ft insp pat ###-####
elevator shaft ftg., wip, ok to pour when ready, no s. i. reqd. design is 2500 psi. 5/2/2001 1:34:52 PM
|