Inspections for the day of: Thursday, May 2, 2002.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-01202 Water and/or Sewer5/1/20025/2/20025/2/2002 12:00:00 AMAPASS
LARRY ###-####
PLM02-01159 Groundwork5/1/20025/2/20025/2/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/01/2002 at 15:12:36. Contact: ###-####.
PLM02-01206 Sprinkler (Final)5/1/20025/2/20025/2/2002 12:00:00 AMAPASS
bill- ###-#### backflow
PLM02-01200 Plumbing Rough-in5/1/20025/2/20025/2/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/01/2002 at 15:42:18. Contact: ###-####.
PLM02-01182 Water and/or Sewer5/1/20025/2/20025/2/2002 12:00:00 AMAPASS
Scheduled by Inspector: 330 On 5/1/2002 4:22:41 PM
PLM02-00605 Plumbing Rough-in5/1/20025/2/20025/2/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 05/01/2002 at 16:40:54. Contact: ###-####. tests wont hold didn't crawl 5/2/2002 3:38:36 PM
PLM02-00409 Final5/2/20025/2/20025/2/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 05/02/2002 at 08:45:47. Contact: ###-####. final ok with master lav replaced 5/2/2002 2:39:15 PM
PLM02-00819 Final5/2/20025/2/20025/2/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 05/02/2002 at 09:05:36. Contact: ###-####. install unions for recirc. pump service, install a hosebib vacuum breaker on the recirc. line drain hose threads. 5/2/2002 2:06:49 PM
PLM02-01205 Sprinkler (Final)5/2/20025/2/20025/2/2002 12:00:00 AMPCANC
Scheduled by Inspector: 330 On 5/2/2002 9:57:15 AM no water meter 5/2/2002 1:34:51 PM
PLM02-00399 Final5/2/20025/2/20025/2/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 05/02/2002 at 10:00:51. Contact: ###-####.
PLM02-01209 Groundwork5/2/20025/2/20025/2/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 05/02/2002 at 10:33:15. Contact: ###-####.
PLM02-01054 Plumbing Rough-in5/2/20025/2/20025/2/2002 12:00:00 AMPPASS
r/i ###-#### -guss
PLM02-01056 Plumbing Rough-in5/2/20025/2/20025/2/2002 12:00:00 AMPPASS
gus ###-#### r/ i