BLD02-00358
| BLD-Framing/Rough-in | 5/1/2002 | 5/2/2002 | 5/2/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 05/01/2002 at 15:06:53. Contact: . Permit not attached to permit, c/n posted, if card conditions does not include a unfinished bonus room re-submittal to plan review is required. Do not insulate 5/2/2002 1:51:08 PM
|
BLD02-00723
| BLD-Foundation | 5/1/2002 | 5/2/2002 | 5/2/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/01/2002 at 19:46:02. Contact: ###-####. wip 5/2/2002 3:50:16 PM
|
BLD02-00284
| BLD-Framing/Rough-in | 5/2/2002 | 5/2/2002 | 5/2/2002 12:00:00 AM | P | PART |
|
|
re-insp fr insp --terry ###-#### ok to insulate 5/2/2002 3:50:30 PM
|
BLD01-02818
| BLD-Final | 5/2/2002 | 5/2/2002 | 5/2/2002 12:00:00 AM | P | FAIL |
|
|
###-#### BOB 5/2/2002 3:50:40 PM
|
BLD02-00508
| BLD-Energy code compliance | 5/2/2002 | 5/2/2002 | 5/2/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 420 On 5/2/2002 1:18:09 PM
|