BLD01-01632
| BLD-Aging Inspection | 5/2/2003 | 5/2/2003 | 5/6/2003 12:00:00 AM | | PASS |
|
|
project in progress 5/6/2003 9:47:06 AM
|
BLD02-00372
| BLD-Conference | 5/1/2003 | 5/2/2003 | 5/5/2003 12:00:00 AM | A | PASS |
|
|
met w/ ISI onsite 5/5/2003 2:03:15 PM
|
BLD02-00371
| BLD-Framing/Rough-in | 5/1/2003 | 5/2/2003 | 5/5/2003 12:00:00 AM | A | PART |
|
|
Bob...Wip, protect gyp from moisture. 5/5/2003 1:52:29 PM
|
BLD03-00147
| BLD-Aging Inspection | 5/2/2003 | 5/2/2003 | 5/2/2003 12:00:00 AM | | DONE |
|
|
roof, exps 7-30-03 5/2/2003 5:51:57 PM
|
BLD02-00370
| BLD-Framing/Rough-in | 4/29/2003 | 5/2/2003 | 5/2/2003 12:00:00 AM | A | PART |
|
|
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs prelim only; wip.
5/2/2003 4:19:52 PM
|
BLD02-02472
| BLD-Other | 4/29/2003 | 5/2/2003 | 5/2/2003 12:00:00 AM | A | NR |
|
|
kevin storage racking; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...called, need fire 1st....recall. 5/2/2003 9:05:42 AM
|
BLD03-00848
| BLD-Footing | 5/1/2003 | 5/2/2003 | 5/2/2003 12:00:00 AM | A | PART |
|
|
LARRY; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD03-00586
| BLD-Final | 5/1/2003 | 5/2/2003 | 5/2/2003 12:00:00 AM | A | PART |
|
|
CHRIS; Phone #: ###-#### Internet Inspection Request from: Darla Downs.visual insp only, installed 5/2/2003 12:04:11 PM
|
BLD03-00444
| BLD-Energy code compliance | 5/1/2003 | 5/2/2003 | 5/2/2003 12:00:00 AM | A | PART |
|
|
tony; Phone #: ###-#### Internet Inspection Request from: Annette Moore...chk floor/attic at final 5/2/2003 11:10:17 AM
|
BLD03-00803
| BLD-Foundation | 5/1/2003 | 5/2/2003 | 5/2/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 5/1/2003 at 4:35:49 PM. Contact: ###-####...walls ok...chk hds at frame 5/2/2003 11:58:34 AM
|
BLD03-00407
| BLD-Framing/Rough-in | 5/2/2003 | 5/2/2003 | 5/2/2003 12:00:00 AM | A | FAIL |
|
|
c/n: air seal, nail joists,add brg studs...verify mech ventilation in lieu of floor insul. 5/2/2003 10:43:38 AM
|
MEC03-01045
| Rough-in | 5/2/2003 | 5/2/2003 | 5/2/2003 12:00:00 AM | A | PART |
|
|
add post/verify crawl ventilation? 5/2/2003 10:42:39 AM
|
MEC03-01045
| Pressure Test | 5/2/2003 | 5/2/2003 | 5/2/2003 12:00:00 AM | A | PART |
|
|
gas pipe istagged/tested? 5/2/2003 10:42:07 AM
|
BLD03-00412
| BLD-Framing/Rough-in | 5/2/2003 | 5/2/2003 | 5/2/2003 12:00:00 AM | P | FAIL |
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Annette Moore...keep 5/2/2003 2:28:16 PM...c/n air seal, brg studs, verify mech. vent at crawl...add Post at furnace... 5/2/2003 2:37:35 PM
|
MIS03-00078
| BLD-Final | 5/2/2003 | 5/2/2003 | 5/2/2003 12:00:00 AM | P | CANC |
|
|
###-#### WENDY
|
BLD02-02638
| BLD-Final | 5/2/2003 | 5/2/2003 | 5/2/2003 12:00:00 AM | P | NR |
|
|
WILLIAM; Phone #: ###-#### Internet Inspection Request from: Annette Moore; need plbg 1st. 5/2/2003 4:24:25 PM
|
BLD02-00370
| BLD-Framing/Rough-in | 5/2/2003 | 5/2/2003 | 5/2/2003 12:00:00 AM | P | PART |
|
|
prelim only, wip 5/5/2003 1:55:37 PM
|
BLD03-00407
| BLD-Conference | 5/2/2003 | 5/2/2003 | 5/2/2003 12:00:00 AM | P | PASS |
|
|
keep c/n 5/2/2003 3:20:49 PM
|
BLD02-00199
| BLD-Foundation | 4/30/2003 | 5/2/2003 | 5/2/2003 12:00:00 AM | P | PART |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore....walls & "core", pend MTI report 5/2/2003 5:09:26 PM
|
BLD03-00416
| BLD-Footing | 5/1/2003 | 5/2/2003 | 5/2/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 5/1/2003 at 5:01:23 PM. ret wall ftg by existing 5/2/2003 4:17:24 PM
|