Inspections for the day of: Monday, May 2, 2005.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorPat Lass
TitleELE-INSPECTOR
Phone #794-9478
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE05-00119 ELE-Aging Inspection5/2/20055/2/20055/2/2005 12:00:00 AM NR
suc 5/2/2005 8:26:10 AM
ELE04-01637 ELE-Aging Inspection5/2/20055/2/20055/2/2005 12:00:00 AM CANC
no time 5/6/2005 10:02:03 AM
ELE04-01860 ELE-Aging Inspection5/2/20055/2/20055/2/2005 12:00:00 AM CANC
no time 5/6/2005 10:01:57 AM
ELE05-01327 Final4/27/20055/2/20055/2/2005 12:00:00 AMAPASS
Please see if can be there before 10:00 A.M. Thank You ; Phone #: ###-#### Internet Inspection Request from: Dana Moyer
ELE05-01459 Permanent Service4/28/20055/2/20055/2/2005 12:00:00 AMANR
###-#### - edward
had conf
drive 2nd ground rod and tie all ground rods together
GEC's to enter through fittings
seal unused opening 5/2/2005 10:32:07 AM
ELE04-00968 Electrical Rough-In4/28/20055/2/20055/2/2005 12:00:00 AMANR
Scheduled by a contractor via Hello! on 4/28/2005 at 12:29:29 PM. Contact: ###-####.
had conf. 5/2/2005 9:29:26 AM
ELE05-01332 Permanent Service4/29/20055/2/20055/2/2005 12:00:00 AMACANC
kevin or ###-#### kirk; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ELE05-01185 Final4/29/20055/2/20055/2/2005 12:00:00 AMAPASS
We replaced 2 single pole circuit breakers with GFCI breakers to protect the receptacles you were concerned with. We also installed a j-box on an existing circuit for the sign guy to connect his sign into.Thanks !!!!Dan. (J-man Craig); Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
ELE05-00067 Final4/29/20055/2/20055/2/2005 12:00:00 AMAPASS
We added a conduit to the bell box for support as per our discussion.The customer has decided to hold off on any further work until later in the year, so you can final out this permit after your re-inspection.Thanks!!!!Dan. (J-man Jason).; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
ELE05-00476 Final5/2/20055/2/20055/2/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 5/2/2005 at 6:23:46 AM. Contact: ###-####.
no card on site 5/2/2005 9:57:04 AM
ELE05-01009 Electrical Rough-In4/28/20055/2/20055/2/2005 12:00:00 AMPFAIL
###-####.Scheduled by a contractor via Hello! on 4/28/2005 at 1:40:03 PM. Contact: ###-####. 5/2/2005 11:39:03 AM
cable hung fixtures not hung in approved way 5/2/2005 3:28:48 PM
ELE04-04022 Electrical Rough-In5/2/20055/2/20055/2/2005 12:00:00 AMPFAIL
###-####. Scheduled by a contractor via Hello! on 5/2/2005 at 7:55:09 AM. Contact: ###-####. 5/2/2005 11:38:47 AM
conduit covered prior to inspection shall not be used unless exposed for inspection. 5/2/2005 4:22:07 PM
ELE05-01332 Final5/2/20055/2/20055/2/2005 12:00:00 AMPPASS
at 1:00 as agreed//kirk bates or kevin at ###-####; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ELE05-01446 Electrical Rough-In5/2/20055/2/20055/2/2005 12:00:00 AMPPASS
doug ###-#### --re-insp
ELE04-00114 Final5/2/20055/2/20055/2/2005 12:00:00 AMPPASS
please call for access///darel; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
no card 5/2/2005 2:38:26 PM