FIR04-00542
| INSP-Final Inspection | 4/28/2005 | 5/2/2005 | 5/3/2005 12:20:55 PM | P | CANC |
|
|
Waiting for information from Brad Turk with HP about nfpa 72 height requirements for a/v's in 1987
|
FIR05-00161
| INSP-Sprinkler Rough-in/Hydro | 5/2/2005 | 5/2/2005 | 5/2/2005 3:50:17 PM | P | PART |
|
|
Hydro test and rough-in passed. Needs tie in to the overhead system and the annual inspection performed on the existing fire sprinkler riser.
|
FIR05-00149
| INSP-Sprinkler Rough-in/Hydro | 5/2/2005 | 5/2/2005 | 5/2/2005 3:48:44 PM | P | FAIL |
|
|
Piping as installed does not match the approved plans. Layout and sizing have changed, heads deleted on the second floor and heads added in the stairs.
|
FIR05-00240
| INSP-Final Inspection | 5/2/2005 | 5/2/2005 | 5/2/2005 2:16:13 PM | P | FAIL |
|
|
sprinkler piping is ok to cover. Can not give final until ceiling tile is in.
|
BLD05-00102
| FIRE-Final Inspection | 5/2/2005 | 5/2/2005 | 5/2/2005 11:31:18 AM | P | PASS |
|
|
Fire life safety, fire alarm and fire sprinkler finaled
|
FIR05-00163
| INSP-Final Inspection | 5/2/2005 | 5/2/2005 | 5/2/2005 11:30:02 AM | P | PASS |
|
|
fire sprinkler finaled
|
BLD05-00043
| FIRE-Conference | 4/30/2005 | 5/2/2005 | 5/2/2005 10:37:08 AM | A | DONE |
|
|
Please coordinate conference with Tony Young. We're trying to hammer out final requirements for partial occupancy. Thank you.; Phone #: ###-#### Internet Inspection Request from: John Lodman
|
BLD05-00367
| FIRE-Final Inspection | 5/2/2005 | 5/2/2005 | 5/2/2005 9:20:47 AM | P | PASS |
|
|
fire life safety finaled
|
FIR05-00132
| INSP-Final Inspection | 5/2/2005 | 5/2/2005 | 5/2/2005 12:00:00 AM | P | PASS |
|
|
Permit finaled
|
FIR05-00173
| INSP-Final Inspection | 5/2/2005 | 5/2/2005 | 5/2/2005 12:00:00 AM | P | PASS |
|
|
Permit finaled
|