Inspections for the day of: Monday, May 2, 2005.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00542 INSP-Final Inspection4/28/20055/2/20055/3/2005 12:20:55 PMPCANC
Waiting for information from Brad Turk with HP about nfpa 72 height requirements for a/v's in 1987
FIR05-00161 INSP-Sprinkler Rough-in/Hydro5/2/20055/2/20055/2/2005 3:50:17 PMPPART
Hydro test and rough-in passed. Needs tie in to the overhead system and the annual inspection performed on the existing fire sprinkler riser.
FIR05-00149 INSP-Sprinkler Rough-in/Hydro5/2/20055/2/20055/2/2005 3:48:44 PMPFAIL
Piping as installed does not match the approved plans. Layout and sizing have changed, heads deleted on the second floor and heads added in the stairs.
FIR05-00240 INSP-Final Inspection5/2/20055/2/20055/2/2005 2:16:13 PMPFAIL
sprinkler piping is ok to cover. Can not give final until ceiling tile is in.
BLD05-00102 FIRE-Final Inspection5/2/20055/2/20055/2/2005 11:31:18 AMPPASS
Fire life safety, fire alarm and fire sprinkler finaled
FIR05-00163 INSP-Final Inspection5/2/20055/2/20055/2/2005 11:30:02 AMPPASS
fire sprinkler finaled
BLD05-00043 FIRE-Conference4/30/20055/2/20055/2/2005 10:37:08 AMADONE
Please coordinate conference with Tony Young. We're trying to hammer out final requirements for partial occupancy. Thank you.; Phone #: ###-#### Internet Inspection Request from: John Lodman
BLD05-00367 FIRE-Final Inspection5/2/20055/2/20055/2/2005 9:20:47 AMPPASS
fire life safety finaled
FIR05-00132 INSP-Final Inspection5/2/20055/2/20055/2/2005 12:00:00 AMPPASS
Permit finaled
FIR05-00173 INSP-Final Inspection5/2/20055/2/20055/2/2005 12:00:00 AMPPASS
Permit finaled