ELE06-00365
| ELE-Aging Inspection | 5/2/2006 | 5/2/2006 | 5/3/2006 4:16:46 PM | | PART |
|
|
wsuc contractor will will call when ready for r/i p/s
|
ELE06-00300
| ELE-Aging Inspection | 5/2/2006 | 5/2/2006 | 5/3/2006 4:15:59 PM | | PART |
|
|
wsuc contractor will call when pool ready for final
|
ELE06-00460
| ELE-Aging Inspection | 5/2/2006 | 5/2/2006 | 5/3/2006 4:14:57 PM | | PART |
|
|
wsuc contractor will call when ready
|
ELE06-01382
| Electrical Rough-In | 5/2/2006 | 5/2/2006 | 5/2/2006 1:38:10 PM | P | FAIL |
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles corr. BCC soffit covered before inspection shall provide access, 314.20 all boxes inside and out shall be flush with finish at time of r/i, 334.30 shall staple romex within 12" of boxes at recess fixtures, called
|
ELE06-01451
| Electrical Rough-In | 5/1/2006 | 5/2/2006 | 5/2/2006 1:04:01 PM | P | PART |
|
|
SCOTT ROUGH-IN WALLS; Phone #: ###-#### Internet Inspection Request from: Sean DeLacy ok
|
ELE06-01216
| Final | 4/26/2006 | 5/2/2006 | 5/2/2006 12:18:14 PM | P | PASS |
|
|
Ready for Final inspection: We 1)upgraded the service and panel to 200 amps, 2)ran a new 30 amp 230 volt circuit to a new disconnect for an AC, the AC man hooked up the AC to our disconnect, 3)installed a new weather proof GFCI receptacle near the AC and fed it from the indoor receptacle. We ended up NOT installing a new circuit to the bathroom as originally planned. (#6040334jg).Jman/Jason/###-####. THANKS !!!!; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|
ELE06-01038
| Permanent Service | 5/2/2006 | 5/2/2006 | 5/2/2006 12:17:53 PM | P | PASS |
|
|
NEED PERM SERVICE INSPECTION ON COOL PED FOR dsl LINES. THANK YOU.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH p/s u/g new ok
|
ELE06-01038
| Final | 5/2/2006 | 5/2/2006 | 5/2/2006 12:17:10 PM | P | PASS |
|
|
NEED PERM SERVICE INSPECTION ON COOL PED FOR dsl LINES. THANK YOU.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH
|
ELE05-04539
| Final | 5/2/2006 | 5/2/2006 | 5/2/2006 11:19:44 AM | P | PASS |
|
|
Rick; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ok
|
ELE06-00700
| Final | 5/1/2006 | 5/2/2006 | 5/2/2006 10:49:33 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 5/1/2006 at 4:00:32 PM. Contact: ###-####. ok
|
ELE06-01515
| Permanent Service | 5/2/2006 | 5/2/2006 | 5/2/2006 10:38:03 AM | P | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Don Lustig Disp set to [CANC] by a contractor via Hello! on May 2 2006 10:38AM.
|
ELE06-01488
| Electrical Rough-In | 5/1/2006 | 5/2/2006 | 5/2/2006 9:22:35 AM | A | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Dana Moyer upstairs bath ok only conference ok
|
ELE06-00069
| Electrical Rough-In | 5/1/2006 | 5/2/2006 | 5/2/2006 8:32:43 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 5/1/2006 at 11:37:41 AM. Contact: ###-####. corr. called 110.3(A&B) shall install floor heat per manufactures instructions leads and sensing probe, BCC south side covered before inspection
|
ELE06-00676
| Final | 5/1/2006 | 5/2/2006 | 5/2/2006 8:04:54 AM | A | PASS |
|
|
re-inspection; Phone #: ###-#### Internet Inspection Request from: TJ Sturges
|
ELE06-00675
| Final | 5/1/2006 | 5/2/2006 | 5/2/2006 8:04:42 AM | A | PASS |
|
|
re-inspect; Phone #: ###-#### Internet Inspection Request from: TJ ok
|
ELE06-00535
| Final | 5/1/2006 | 5/2/2006 | 5/1/2006 4:07:15 PM | A | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton Inspection cancelled from web by: Kerri Hamilton
|