Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00256 INSP-Sprinkler Rough-in5/2/20065/2/20065/3/2006 8:07:34 AMPNR
Hydrostatic test not ready for inspection per contractor, to be rescheduled.
BLD05-02358 FIRE-Final Inspection5/2/20065/2/20065/3/2006 8:06:05 AMPNR
The project related fire sprinkler permit must be finaled before life safety final approval.
BLD05-00087 FIRE-Conference5/2/20065/2/20065/2/2006 3:09:15 PMPDONE
On site confrence to discuss emergency lighting requirements for the path of egress as indicated on approved plans.
FIR05-00600 INSP-Sprinkler Rough-in5/2/20065/2/20065/2/2006 2:59:33 PMPPART
UG hydrostatic test passed inspection.
MIS06-00081 FIR-Final4/25/20065/2/20065/2/2006 12:57:06 PMPFAIL
Need to provide building address, provide fire extinguisher with current certification tag, cover open electrical boxes, provide approved door hardware at the main entry/exit door, remove or provide correct hardware at the remaining doors, partitions and gates have not been installed at this time as shown on plan.
FIR05-00398 INSP-Sprinkler Rough-in5/1/20065/2/20065/2/2006 11:27:47 AMPPASS
The remainder of overhead work for this permit is good for cover, project is ready for final when all ceiling tile is installed.
FIR06-00140 INSP-Sprinkler Rough-in5/1/20065/2/20065/2/2006 11:25:48 AMPPART
Overhead rough-in is good for cover at the drop ceiling areas as marked on approved plans, two rooms at the NE corner are not complete or inspected at this time.
FIR05-00846 INSP-Final Inspection5/1/20065/2/20065/2/2006 11:19:05 AMAPASS
Fire sprinkler work is satisfactory, inspection passed, permit finaled.
BLD04-03034 FIRE-Final Inspection5/1/20065/2/20065/2/2006 11:17:52 AMADONE
Duplicate inspection request already completed.
BLD04-03034 FIRE-Final Inspection5/1/20065/2/20065/2/2006 9:46:03 AMAFAIL
The project related fire sprinkler permit must be finaled prior to life safety approval, some items noted on walk through include exit sign at the SW door needs repaired, manual flush bolts on the inactive leaf at the north exit are not allowed, need to test emergency lights, provide lever hardware at the paint room door, provide approved building plans and review notes at the next inspection, not all items reviewed at this time.
FIR06-00296 INSP-Sprinkler Rough-in5/1/20065/2/20065/1/2006 12:00:00 AMPCANC
###-#### Mike\\per Mary can not have insp.