Inspections for the day of: Tuesday, May 2, 2006.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS05-00175 FIR-Final5/2/20065/2/20065/2/2006 4:19:06 PMPPASS
Life safety finaled.
FIR05-00850 INSP-Sprinkler Rough-in5/2/20065/2/20065/2/2006 3:37:24 PMPPASS
underground hydro test passed
FIR06-00239 INSP-Sprinkler Rough-in5/2/20065/2/20065/2/2006 3:34:33 PMPPASS
Underground hydro test passed.
FIR06-00077 INSP-Final Inspection5/2/20065/2/20065/2/2006 2:41:26 PMPFAIL
Resubmit plans and hydraulic calculations showing the correct backflow preventor and showing the correct riser nipple sizing on the west floater main. Also the hydraulic calculations have not been peaked per review note #2 and column protection is required per note #1.
FIR06-00222 INSP-Sprinkler Rough-in/Hydro5/2/20065/2/20065/2/2006 1:57:41 PMPPART
Sprinkler piping is ok to cover. Tenting passed. The riser has not been installed yet. The 1 1/4" piping that passes under the floor has not been insulated yet. Upon review of the plan review notes many items had not been addressed by the contractor and are left for field inspector to verify. I made a phone call to Bill Alexander and went over the items and it was decided that a resubmittal will be required. Much of the items concern the supply from the street. Other items include the added heads due to lights. One additional head will be required under the stairs due to obstructions. I notified Scott with Shilo of all of these items.
FIR06-00151 INSP-Final Inspection5/1/20065/2/20065/2/2006 10:36:17 AMAPASS
permit finaled