Inspections for the day of: Wednesday, May 2, 2007.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00857 FIR-Aging Inspection5/2/20075/2/20075/4/2007 1:53:18 PM DONE
wip
FIR06-00540 INSP-Sprinkler Rough-in4/25/20075/2/20075/2/2007 5:08:09 PMPNR
Fire Pump Test (Forrest) and for Info Sam
Per a conversation with Sam this morning we will do a pump run complete with test header flows,bypass flows,emergency power transfer. Phone #: ###-#### Internet Inspection Request from: Lynn Beus ............ Per conversation with the foreman on site, pump testing pending replacement of one component at the discharge side and scheduling with the pump mfr. rep to be present during testing.
FIR07-00174 INSP-Supply line flush5/1/20075/2/20075/2/2007 5:00:34 PMPPART
UG supply line flush completed.
FIR07-00240 INSP-Sprinkler Rough-in/Hydro5/2/20075/2/20075/2/2007 4:59:40 PMPPART
Begin air test 2:35 pm @ 52psi. as marked on guage.
BLD05-01077 FIRE-Final Inspection4/30/20075/2/20075/2/2007 3:07:11 PMADEFR
Inspection rescheduled per conversation with building engineer.
FIR07-00312 INSP-Sprinkler Rough-in5/1/20075/2/20075/2/2007 2:32:24 PMAPART
OH install is satisfactory, noted approval for cover pending inspection for cold cavity protection (tenting) as discussed with contractor.
BLD06-01131 FIRE-Final Inspection5/1/20075/2/20075/2/2007 1:06:14 PMAPASS
Final fire life safety inspection passed, noted corrections complete.
FIR07-00204 INSP-Sprinkler Rough-in5/1/20075/2/20075/2/2007 12:50:19 PMAPART
Overhead rough-in at the 1st and 2nd floor elevator lobby and restroom hard lids are good for cover as red lined on approved plans.
FIR07-00240 INSP-Sprinkler Rough-in5/1/20075/2/20075/2/2007 12:12:00 PMAPART
OH installation is acceptable, hydrostatic test of the preaction system completed, noted changes at preaction riser including drain termination point, different PRV than what is submitted, riser trim has been modified to include a potter ps40 in lieu of the mfg. supplied pressure switch.
FIR07-00255 INSP-Final Inspection5/2/20075/2/20075/2/2007 9:24:17 AMAPASS
Fire sprinkler permit finaled.
BLD05-01077 FIRE-Final Inspection4/30/20075/2/20074/30/2007 10:57:47 AMACANC
jim - fire life safety ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith Inspection cancelled from web by: Andrea Whiteman