FIR06-00482
| INSP-Final Inspection | 4/30/2007 | 5/2/2007 | 5/2/2007 4:36:12 PM | P | PASS |
|
|
permit finaled
|
FIR06-00536
| INSP-Sprinkler Rough-in | 5/2/2007 | 5/2/2007 | 5/2/2007 4:15:33 PM | P | PASS |
|
|
hydro test of the fdc passed.
|
BLD06-03284
| FIRE-Final Inspection | 5/1/2007 | 5/2/2007 | 5/2/2007 4:14:27 PM | P | FAIL |
|
|
Remove the deadbolts from the doors as discussed, provide occupant load signs and repair all new and existing exit/emergency lights. When this is done a temporary occupancy can be given.
|
FIR07-00079
| INSP-Sprinkler Rough-in/Hydro | 5/1/2007 | 5/2/2007 | 5/2/2007 1:28:08 PM | A | PASS |
|
|
The 1st, 2nd, 3rd and attic hydro test passed. The fdc still needs tested.
|
FIR05-00822
| INSP-Sprinkler Rough-in | 5/1/2007 | 5/2/2007 | 5/2/2007 11:33:34 AM | A | PASS |
|
|
Items listed on the plans have been corrected.
|
BLD06-01654
| FIRE-Final Inspection | 5/1/2007 | 5/2/2007 | 5/2/2007 9:32:53 AM | A | PASS |
|
|
LIfe safety passed.
|