FIR07-00606
| INSP-Sprinkler Rough-in/Hydro | 5/1/2008 | 5/2/2008 | 5/5/2008 9:28:34 AM | P | PART |
|
|
OH hydrostatic test passed for system #2 only.
|
FIR07-00505
| INSP-Sprinkler Rough-in/Hydro | 5/1/2008 | 5/2/2008 | 5/2/2008 3:49:48 PM | P | PART |
|
|
UG fire supply line and remote FDC piping passed hydrostatic testing.
|
BLD08-00706
| FIRE-Final Inspection | 5/1/2008 | 5/2/2008 | 5/2/2008 3:47:52 PM | A | PASS |
|
|
Correction items are finished, occupant load adjusted per R. Hill to 49, life safety finaled.
|
FIR08-00130
| INSP-Supply line flush | 5/1/2008 | 5/2/2008 | 5/2/2008 3:45:50 PM | P | PART |
|
|
UG fire supply line flush completed satisfactory.
|
FIR08-00236
| INSP-Final Inspection | 5/1/2008 | 5/2/2008 | 5/2/2008 2:36:59 PM | A | NH |
|
|
Contractor not on site, plans need to be available for inspection, rescheduled site visit with contact per phone conversation.
|
BLD06-00195
| FIRE-Final Inspection | 5/1/2008 | 5/2/2008 | 5/2/2008 1:15:42 PM | A | PASS |
|
|
Life safety inspection completed acceptable pending the installation of lever hardware at the second exit door-to be verified at the structural final per agreement with contractor.
|
FIR06-00595
| INSP-Final Inspection | 5/1/2008 | 5/2/2008 | 5/2/2008 12:03:44 PM | A | DEFR |
|
|
Scheduled by a contractor via Hello! on 5/1/2008 at 5:20:41 PM. Contact: ###-####.
|
BLD07-01091
| FIRE-Final Inspection | 5/1/2008 | 5/2/2008 | 5/2/2008 12:02:50 PM | A | PASS |
|
|
NOTE: fire sprinkler and fire alarm work for this area completed under BLD07-01692 project related FIR #'s. Fire life safety inspection passed.
|
BLD07-01692
| FIRE-Final Inspection | 5/1/2008 | 5/2/2008 | 5/2/2008 11:58:28 AM | A | PART |
|
|
Fire life safety is satisfactory for the areas inspected today including the sat. pharmacy, work room and anesthesia soils room, door seals installed while on site, one noted fire sprinkler head at the pharmacy has been added, adjacent fire doors at the corridor to be adjusted as discussed with contractor.
|
FIR08-00068
| INSP-Sprinkler Rough-in | 5/1/2008 | 5/2/2008 | 5/2/2008 11:02:06 AM | A | PART |
|
|
Inspection completed for hard lid areas finished to date, okayed for cover storage rooms 129A, 108A, work room 128, mens restrooms 147 and 148, womens restroom 145. NOTE: no approval for cover at womens restroom 149 due to missing hanger at the arm-over to the pendent head, see stamped plan set for annotations.
|
FIR07-01041
| INSP-Sprinkler Rough-in/Hydro | 5/1/2008 | 5/2/2008 | 5/2/2008 10:57:44 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 5/1/2008 at 12:02:49 PM. Contact: ###-####. Inspection rescheduled per phone conversation with contractor.
|
FIR08-00066
| INSP-Sprinkler Rough-in | 5/1/2008 | 5/2/2008 | 5/2/2008 10:56:39 AM | A | PART |
|
|
See approved plans for areas previously marked as okay for cover-no new hard lids to inspect at this time, new south entrance vestibule is not yet piped, be aware of possible obstructions/spacing issues at the front soffits depending on drop ceiling heights and head locations.
|