FIR08-00036
| INSP-Sprinkler Rough-in/Hydro | 5/1/2008 | 5/2/2008 | 5/2/2008 4:09:59 PM | P | FAIL |
|
|
Above ground hydro test failed due to leaks. To be rescheduled for monday.
|
FIR08-00174
| INSP-Final Inspection | 5/2/2008 | 5/2/2008 | 5/2/2008 3:41:11 PM | P | PASS |
|
|
Permit finaled
|
BLD08-00165
| FIRE-Final Inspection | 5/1/2008 | 5/2/2008 | 5/2/2008 2:57:29 PM | A | PASS |
|
|
Life safety passed.
|
FIR08-00122
| INSP-Final Inspection | 5/1/2008 | 5/2/2008 | 5/2/2008 2:52:09 PM | A | FAIL |
|
|
I was at this project twice today. The first time I found that there was only one phone line being used. I ended the inspection there. I came back after Art, the technician, provided a second phone line. All items have been tested but some corrections are required. A map needs to be available at the facp, the old facp and devices need demoed, the phone lines need rerouted, the low air signals need to report as supervisory and not troubles and the PIV needs to signal the facp after 2 1/2 turns and not report as an alarm but as a supervisory signal. The horns are not syncronized either.
|
FIR07-00929
| INSP-Final Inspection | 5/1/2008 | 5/2/2008 | 5/2/2008 2:45:32 PM | A | FAIL |
|
|
Need the pallets that have been placed on top of the couch storage boxes removed. I let the warehouse manager know that no items can be stored there. The PIV tamper switch needs adjusted so that it reports correctly. The forward flush passed. The trip tests of the two dry systems passed.
|
BLD07-02197
| FIRE-Final Inspection | 5/1/2008 | 5/2/2008 | 5/2/2008 12:53:18 PM | A | FAIL |
|
|
Provide a smoke alarm immediatey outside of the bottom floor bedroom as per code and shown on the approved plans. I notified the contractor the the smoke detectors in the second floor corridor will need to be centered on all future apartments. Contractor to provide approved drawing that shows the location of the two new fire hydrants.
|
BLD07-02188
| FIRE-Final Inspection | 5/1/2008 | 5/2/2008 | 5/2/2008 12:52:16 PM | A | FAIL |
|
|
Provide a smoke alarm immediatey outside of the bottom floor bedroom as per code and shown on the approved plans. I notified the contractor the the smoke detectors in the second floor corridor will need to be centered on all future apartments. Contractor to provide approved drawing that shows the location of the two new fire hydrants.
|
BLD07-02171
| FIRE-Final Inspection | 5/1/2008 | 5/2/2008 | 5/2/2008 12:51:24 PM | A | FAIL |
|
|
Provide a smoke alarm immediatey outside of the bottom floor bedroom as per code and shown on the approved plans. I notified the contractor the the smoke detectors in the second floor corridor will need to be centered on all future apartments. Contractor to provide approved drawing that shows the location of the two new fire hydrants.
|
BLD07-02159
| FIRE-Final Inspection | 5/1/2008 | 5/2/2008 | 5/2/2008 12:50:50 PM | A | FAIL |
|
|
Provide a smoke alarm immediatey outside of the bottom floor bedroom as per code and shown on the approved plans. I notified the contractor the the smoke detectors in the second floor corridor will need to be centered on all future apartments. Contractor to provide approved drawing that shows the location of the two new fire hydrants.
|