BLD13-00852
| BLD-Framing/Rough-in | 5/2/2013 | 5/2/2013 | 5/3/2013 9:09:26 AM | P | NR |
|
|
Greg ###-####
|
BLD13-00554
| BLD-Energy code compliance | 5/2/2013 | 5/2/2013 | 5/3/2013 8:14:54 AM | P | PASS |
|
|
DAVID PLEASE CALL IF HAVE QUE Phone #: ###-####
|
GCB13-00040
| GCB-Footing | 5/1/2013 | 5/2/2013 | 5/3/2013 8:13:34 AM | P | PASS |
|
|
Huron ###-####
|
BLD13-00852
| BLD-Framing/Rough-in | 5/1/2013 | 5/2/2013 | 5/3/2013 8:12:31 AM | A | NR |
|
|
Gregory Phone #: ###-#### Need Electr and Plumb rough-in inspections.
|
BLD12-02997
| BLD-Final | 5/2/2013 | 5/2/2013 | 5/3/2013 8:11:10 AM | P | PASS |
|
|
IORDANESCU Phone #: ###-####
|
BLD13-00852
| BLD-Conference | 5/1/2013 | 5/2/2013 | 5/2/2013 10:48:24 AM | A | DONE |
|
|
Call daryl
|
GCB12-00145
| GCB-Final | 5/1/2013 | 5/2/2013 | 5/2/2013 10:44:33 AM | A | PASS |
|
|
Brayden Phone #: ###-#### Unable to determine if all other permits have been finaled. Structural Final only.......OK.
|
BLD13-00871
| BLD-Footing | 5/1/2013 | 5/2/2013 | 5/2/2013 10:41:30 AM | A | PASS |
|
|
Mark Hansen Phone #: ###-####
|
BLD13-00308
| BLD-Conference | 5/1/2013 | 5/2/2013 | 5/2/2013 10:38:31 AM | A | PASS |
|
|
chuck Phone #: ###-#### Note..........Inspection and approval of front Canopy Framing...OK.
|
BLD13-01000
| BLD-Final | 5/1/2013 | 5/2/2013 | 5/2/2013 9:15:47 AM | P | PASS |
|
|
tom Phone #: ###-#### OK for Perm Occ.
|