ELE12-00443
| ELE-Aging Inspection | 5/2/2014 | 5/2/2014 | 5/2/2014 2:57:57 PM | | DONE |
|
|
Still under construction
|
ELE12-02127
| ELE-Aging Inspection | 5/2/2014 | 5/2/2014 | 5/2/2014 2:54:25 PM | | DONE |
|
|
Still under construction
|
ELE10-01638
| ELE-Aging Inspection | 5/2/2014 | 5/2/2014 | 5/2/2014 2:20:27 PM | | DONE |
|
|
Still Under construction
|
ELE14-00884
| Final | 5/2/2014 | 5/2/2014 | 5/2/2014 2:17:30 PM | P | PASS |
|
|
Dan Phone #: ###-#### Final ok
|
ELE14-00883
| Final | 5/2/2014 | 5/2/2014 | 5/2/2014 2:03:30 PM | P | NR |
|
|
Dan Phone #: ###-#### Show window and exit on east side not complete.
|
ELE14-00883
| Electrical Rough-In | 5/2/2014 | 5/2/2014 | 5/2/2014 1:38:13 PM | P | PART |
|
|
Dan Phone #: ###-#### East tiles will be lift out so can inspect exit and show window boxes. Rest of ceiling rough in ok cover
|
ELE14-00829
| Final | 5/2/2014 | 5/2/2014 | 5/2/2014 1:16:33 PM | P | PASS |
|
|
call first Phone #: ###-#### >> Inspection requested via web by PAT MILLER Final ok
|
ELE13-03533
| Final | 5/2/2014 | 5/2/2014 | 5/2/2014 12:41:13 PM | P | PASS |
|
|
vince Phone #: ###-#### Final ok
|
ELE14-01011
| Final | 5/1/2014 | 5/2/2014 | 5/2/2014 10:48:01 AM | A | PASS |
|
|
Crescent rim Condos unit 2-303 Gil ###-#### Phone #: ###-#### >> Inspection requested via web by Emmet Bushman Final ok
|
ELE14-01010
| Final | 5/1/2014 | 5/2/2014 | 5/2/2014 10:42:40 AM | A | PASS |
|
|
Crescent Rim Condos unit 3-404 Gil ###-#### Phone #: ###-#### >> Inspection requested via web by Emmet Bushman Final ok
|
ELE14-01095
| Electrical Rough-In | 5/1/2014 | 5/2/2014 | 5/2/2014 10:10:44 AM | A | FAIL |
|
|
Phone #: ###-#### >> Inspection requested via web by Stacie Tasker Idaho power requires an expansion joint on all underground service entrance conduits for residential. 250.52(B)(1)- Metal gas piping systems shall not be used as grounding electrodes. 250.104(B) not enforced in Idaho. 334.30- NM cable shall be secured with in 12" of box. 210.52- Up bedroom, any wall space 24" and wider shall have receptical outlet installed.
|
ELE14-01100
| Conference | 5/1/2014 | 5/2/2014 | 5/2/2014 9:29:42 AM | A | DONE |
|
|
Gregory-please call to meet Phone #: ###-#### Discussed code changes between 100 and 200 amp services.
|
ELE13-01492
| Final | 5/1/2014 | 5/2/2014 | 5/2/2014 9:00:44 AM | A | PASS |
|
|
>> Inspection requested via web by shane miller Final ok
|
ELE14-00860
| Electrical Rough-In | 5/2/2014 | 5/2/2014 | 5/2/2014 8:39:26 AM | A | PASS |
|
|
exterior lights Phone #: ###-#### >> Inspection requested via web by Lee VanSchoiack Exterior lighting on north, east, south sides and new cooler rough in ok cover
|