ELE15-03901
| Electrical Rough-In | 5/2/2016 | 5/2/2016 | 5/2/2016 4:26:38 PM | P | CANC |
|
|
Call Joey for R/I inspection of executive stairwell from 9th floor to executive suite (10th floor). Phone #: ###-#### Inspection requested via web by Rafael Castillo Lea electric guys gone for the day. Missed this inspection. Called Joey and he will reschedule inspection
|
ELE15-00495
| Conference | 5/2/2016 | 5/2/2016 | 5/2/2016 4:24:00 PM | P | DONE |
|
|
Walk thru and verify working clearances for HVAC units in ceilings with ESI and HVAC installers. Verify working space in electrical rooms. Contact Toby Groves ###-####. If possible 15min prior to arrival so all parties can be notified and ready to walk. Thank you. Phone #: ###-#### Inspection requested via web by Toby Groves walk thru floors 2 thru 6 to identify problem areas. Superintident with ESI "Ron" says he will relay info to TML and Lea electric for their problem areas also where there isn't at least 24" clearance MINIMUM for HVAC control boxes. Linesets, sprinkelers,duct work and electrical conduits in front of control boxes and not meeting clearances. Also performed r/i inspection on 2 and 3
|
ELE15-00495
| Electrical Rough-In | 5/2/2016 | 5/2/2016 | 5/2/2016 4:17:54 PM | P | PASS |
|
|
Walk thru and verify working clearances for HVAC units in ceilings with ESI and HVAC installers. Verify working space in electrical rooms. Contact Toby Groves ###-####. If possible 15min prior to arrival so all parties can be notified and ready to walk. Thank you. Phone #: ###-#### Inspection requested via web by Toby Groves r/i ok 2nd floor n. west office walls and 3rd floor wall see ESI prints
|
ELE16-01376
| Electrical Rough-In | 5/2/2016 | 5/2/2016 | 5/2/2016 2:00:21 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by JENNY EMEL r/i walls ok
|
ELE16-00422
| Final | 4/29/2016 | 5/2/2016 | 5/2/2016 1:08:25 PM | P | PASS |
|
|
Lockbox code is 6008 Phone #: ###-#### Inspection requested via web by Cindie Swaim final ok
|
ELE16-00185
| Electrical Rough-In | 4/29/2016 | 5/2/2016 | 5/2/2016 12:35:34 PM | P | PASS |
|
|
Max Phone #: ###-#### r/i ok 1st and 2nd floor walls and soffits
|
ELE16-01354
| Rough-In Permanent Service | 4/29/2016 | 5/2/2016 | 5/2/2016 10:18:35 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman r/i ok p/s u/g n ok
|
ELE16-01364
| Electrical Rough-In | 4/29/2016 | 5/2/2016 | 5/2/2016 9:48:24 AM | A | PASS |
|
|
Please call Mike when you are on your way ###-####. Thank You. Phone #: ###-#### Inspection requested via web by Clay Morgan r/i ok upst. bathroom
|
ELE15-02641
| Electrical Rough-In | 4/30/2016 | 5/2/2016 | 5/2/2016 8:56:38 AM | A | PASS |
|
|
Ryan 7th Floor Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok mechancical penthouse/ elevator room walls and ceiling
|