FIR15-00905
| INSP-Final Inspection | 5/2/2016 | 5/2/2016 | 5/2/2016 3:25:26 PM | P | FAIL |
|
|
Fire sprinkler interconnect with the FACP is finished. Need ceiling in the Gas Room and canopys on the pendant sprinkler heads for final.
|
FIR15-00905
| INSP-Alarm Testing | 5/2/2016 | 5/2/2016 | 5/2/2016 3:24:25 PM | P | DONE |
|
|
Fire sprinkler interconnect with the FACP is finished. Need ceiling in the Gas Room and canopys on the pendant sprinkler heads for final.
|
FIR15-00891
| INSP-Final Inspection | 5/2/2016 | 5/2/2016 | 5/2/2016 3:22:42 PM | P | PASS |
|
|
Permit finaled
|
FIR16-00246
| INSP-Sprinkler Rough-in | 4/29/2016 | 5/2/2016 | 5/2/2016 10:46:04 AM | A | PASS |
|
|
Permit finaled
|
BLD16-00496
| FIRE-Final Inspection | 5/2/2016 | 5/2/2016 | 5/2/2016 9:05:50 AM | P | PASS |
|
|
Life safety passed
|
FIR16-00225
| INSP-Sprinkler Rough-in | 4/29/2016 | 5/2/2016 | 5/2/2016 8:40:10 AM | A | PASS |
|
|
Remaining piping is ok to cover. This includes the soffits and rear Storage Room.
|
BLD16-00541
| FIRE-Final Inspection | 4/29/2016 | 5/2/2016 | 5/2/2016 8:37:40 AM | A | PASS |
|
|
Zack Phone #: ###-####
|