ELE12-02116
| ELE-Aging Inspection | 5/2/2018 | 5/2/2018 | 5/3/2018 7:20:19 AM | | DONE |
|
|
Please call and update on job activity.
|
ELE17-03996
| Final | 5/2/2018 | 5/2/2018 | 5/2/2018 2:02:09 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Eric Brown Ok final. Talked to builder about finished grade and to not bury expansion coupling.
|
ELE18-01655
| Conference | 5/2/2018 | 5/2/2018 | 5/2/2018 1:05:02 PM | P | DONE |
|
|
CALL ME PRIOR TO ARRIVING Phone #: ###-#### Inspection requested via web by Hidajet Zahic Discussed bringing electrical up to current code. Any wall that is open needs to be brought up to code as far as outlet requirements in kitchen and other areas. Sub panel needs to be re-fed from 200a meter main. Conductors are not in conduit, they are single runs in the attic. All boxes need connectors, and possibly box extensions in some areas due to box fill.
|
ELE18-00736
| Final | 5/1/2018 | 5/2/2018 | 5/2/2018 11:31:19 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ben Archibald Ok final.
|
ELE18-01579
| Final | 5/1/2018 | 5/2/2018 | 5/2/2018 10:48:42 AM | A | PASS |
|
|
Please call when on way ###-#### Phone #: ###-#### Inspection requested via web by Same Electric Ok final.
|
ELE18-01386
| Final | 5/1/2018 | 5/2/2018 | 5/2/2018 10:01:37 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wake Ok final.
|
ELE18-01534
| Final | 5/1/2018 | 5/2/2018 | 5/2/2018 10:01:14 AM | P | PASS |
|
|
We will call in the morning and schedule a time to meet you onsite! Phone #: ###-#### Inspection requested via web by Jesse Simpson Ok final.
|
ELE18-01574
| Final | 5/1/2018 | 5/2/2018 | 5/2/2018 10:00:55 AM | A | PASS |
|
|
Please contact Tate Borstelman with any questions. Inspection is being done in conjunction with Altenergy solar inspection Phone #: ###-#### Inspection requested via web by JENNY EMEL Ok final.
|
ELE18-01534
| Electrical Rough-In | 5/1/2018 | 5/2/2018 | 5/2/2018 10:00:27 AM | A | PASS |
|
|
We will call in the morning and schedule a time to meet you onsite! Phone #: ###-#### Inspection requested via web by Jesse Simpson Ok cover. Components UL listed.
|
ELE18-01556
| Conference | 5/1/2018 | 5/2/2018 | 5/2/2018 9:05:56 AM | A | DONE |
|
|
Brian Phone #: ###-#### Discussed requirements for solar install. Panels already mounted. Other work still needs done. Disc, conduit etc.
|