BLD02-03001
| BLD-Framing/Rough-in | 5/19/2003 | 5/20/2003 | 5/20/2003 12:00:00 AM | A | NR |
|
|
ed partial shear ; Phone #: ###-#### Internet Inspection Request from: Barbara MooreNeed to nail at all studs with hds. no c/n contractor on site. 5/20/2003 11:58:44 AM
|
BLD03-00624
| BLD-Framing/Rough-in | 5/19/2003 | 5/20/2003 | 5/20/2003 12:00:00 AM | A | NR |
|
|
clint please call ahead; Phone #: ###-#### Internet Inspection Request from: Barbara Moore . As per the c/n posted needs to submit as built plans to plan review, also George went over this with me this morning I called Clint and advised him of the above. 5/20/2003 4:56:53 PM
|
BLD03-00522
| BLD-Framing/Rough-in | 5/19/2003 | 5/20/2003 | 5/20/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 5/19/2003 at 2:47:47 PM. Contact: ###-####.C/n posted. also called contractor. 5/20/2003 11:11:43 AM 5/20/2003 11:11:55 AM
|
BLD03-00522
| BLD-Energy code compliance | 5/19/2003 | 5/20/2003 | 5/20/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 5/19/2003 at 2:48:39 PM. Contact: ###-####.C/n posted also called contractor. 5/20/2003 11:12:07 AM
|
BLD02-01073
| BLD-Framing/Rough-in | 5/19/2003 | 5/20/2003 | 5/20/2003 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 5/19/2003 at 5:57:10 PM. Contact: ###-####.I called contractor he needs to submit exterior wall detail assembly for 1hr construction. Same for entire project. 5/20/2003 4:59:16 PM
|
BLD03-00812
| BLD-Framing/Rough-in | 5/20/2003 | 5/20/2003 | 5/20/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 5/20/2003 at 7:23:40 AM. Contact: ###-####. There is no electrical in the new walls at this time the contractor stated there may be as tennent wanted ele out let I informed him that this would require a permit and inspection, also I would note this on record, brace top of new 90 deg wall at rear contractor will leave out a tile. 5/20/2003 11:57:01 AM
|
BLD03-00528
| BLD-Footing | 5/20/2003 | 5/20/2003 | 5/20/2003 12:00:00 AM | P | NR |
|
|
JAY; Phone #: ###-#### Internet Inspection Request from: Darla DownsAlso permit indcates geo tec report after excavation one has been done prior to this informed them this day also hole dug back 15 foot will re-excavate 5/20/2003 4:55:34 PM
|
BLD02-01065
| BLD-Conference | 5/19/2003 | 5/20/2003 | 5/20/2003 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 5/19/2003 at 5:58:38 PM. Contact: ###-####.All corrections need to be complied with as the 1hr exterior wall detail for assembly. 5/20/2003 5:00:08 PM
|