MEC03-01267
| Pressure Test | 5/19/2003 | 5/20/2003 | 5/20/2003 12:00:00 AM | A | FAIL |
|
|
###-#### jeff please call first No pressure on guage--will correct and recall. 5/20/2003 9:13:38 AM
|
BLD03-00831
| BLD-Foundation | 5/20/2003 | 5/20/2003 | 5/20/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 5/20/2003 at 6:32:02 AM. Contact: ###-####. wip--25% ready at time of inspection. 5/20/2003 11:27:22 AM
|
BLD03-00871
| BLD-Foundation | 5/19/2003 | 5/20/2003 | 5/20/2003 12:00:00 AM | A | PART |
|
|
bob ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore wip--85% ready at time of inspection. 5/20/2003 10:35:42 AM
|
BLD02-02673
| BLD-Final | 5/19/2003 | 5/20/2003 | 5/20/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 5/19/2003 at 4:30:11 PM. Contact: ###-####. C. of C #23380 issued. 5/20/2003 2:28:53 PM
|
MEC03-01195
| Final | 5/20/2003 | 5/20/2003 | 5/20/2003 12:00:00 AM | P | PASS |
|
|
PLEASE INSPECT AS CLOSE TO 2:00PM AS POSSIBLE. GAS TEST TO POOL HEATER ONLY BUT WILL HAVE TO SHUT THE WHOLE HOUSE DOWN TO CHANGE METER.; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen, Pressure test and gas line to in-ground pool. 5/20/2003 2:59:29 PM
|
MIS03-00091
| BLD-Final | 5/20/2003 | 5/20/2003 | 5/20/2003 12:00:00 AM | P | PASS |
|
|
patricia ###-#### Ok pending fire final. 5/20/2003 1:38:17 PM
|