ELE04-01473
| Electrical Rough-In | 5/19/2004 | 5/20/2004 | 5/20/2004 12:00:00 AM | A | PASS |
|
|
mike ###-####
|
ELE04-00811
| Final | 5/19/2004 | 5/20/2004 | 5/20/2004 12:00:00 AM | A | FAIL |
|
|
final: Sign listing on power pole; Phone #: ###-#### Internet Inspection Request from: Tyler Bowen
numbers don't match 5/20/2004 11:20:34 AM
|
ELE03-04028
| Conference | 5/19/2004 | 5/20/2004 | 5/20/2004 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 5/19/2004 at 3:37:06 PM. Contact: ###-####.
grounding electrode conductors to be installed correctly at both structures 5/20/2004 10:29:46 AM
|
ELE03-03890
| Final | 5/19/2004 | 5/20/2004 | 5/20/2004 12:00:00 AM | A | PASS |
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
ELE04-00525
| Final | 5/19/2004 | 5/20/2004 | 5/20/2004 12:00:00 AM | P | PASS |
|
|
eric; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|