PLM04-01329
| Sprinkler (Final) | 5/19/2004 | 5/20/2004 | 5/20/2004 12:00:00 AM | A | PASS |
|
|
Rod ###-####
|
PLM04-01333
| Water and/or Sewer | 5/19/2004 | 5/20/2004 | 5/20/2004 12:00:00 AM | A | PASS |
|
|
###-#### eddie
|
PLM04-01134
| Plumbing Rough-in | 5/20/2004 | 5/20/2004 | 5/20/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 5/20/2004 at 7:03:48 AM. Contact: ###-####.
|
PLM04-00430
| Final | 5/20/2004 | 5/20/2004 | 5/20/2004 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 5/20/2004 at 11:13:42 AM. Contact: ###-####. installed check valve between expansion tank and water heater 5/20/2004 3:51:20 PM
|