FIR08-00138
| INSP-Sprinkler Rough-in/Hydro | 5/19/2008 | 5/20/2008 | 5/20/2008 5:01:34 PM | P | PASS |
|
|
The overhead hydro test passed. The rough-in inspection passed except for two items that jeff is getting back to me on. Item 1 is the 1" earthquake bracing for the 6" main is at a 0 degree angle the second item is the heads that are installed do not appear to match the drawings.
|
FIR07-00702
| INSP-Sprinkler Rough-in | 5/20/2008 | 5/20/2008 | 5/20/2008 3:27:14 PM | P | FAIL |
|
|
Almost all of the ceiling tile has been installed prior to a rough-in inspection. I let Cole know that the ceiling tile needs to come back out. Only the areas as marked on the approved plans were ok to cover. No inspection performed.
|
BLD08-00436
| FIRE-Final Inspection | 5/20/2008 | 5/20/2008 | 5/20/2008 2:06:45 PM | P | FAIL |
|
|
One upright sprinkler is too close to the wall. Another two are two close together and sprinkler spacing needs to be verified by a qualified sprinkler contractor for coverage on either side of the new wall. A permit will be required for this work. All other life safety items are ok.
|
BLD07-00143
| FIRE-Alarm Testing | 5/19/2008 | 5/20/2008 | 5/20/2008 2:04:55 PM | A | FAIL |
|
|
No inspection was performed due to the DACT not reporting telephone troubles to the monitoring station and not annunciating at the site.
|
FIR07-00874
| INSP-Sprinkler Rough-in | 5/19/2008 | 5/20/2008 | 5/20/2008 2:03:09 PM | A | PASS |
|
|
The AOF dining area dry system is ok to cover.
|
MIS07-00153
| FIR-Final | 5/20/2008 | 5/20/2008 | 5/20/2008 11:07:03 AM | A | PASS |
|
|
life safety passed
|
BLD08-00735
| FIRE-Final Inspection | 5/19/2008 | 5/20/2008 | 5/20/2008 11:06:12 AM | A | PASS |
|
|
life safety passed
|
BLD07-01201
| FIRE-Final Inspection | 5/19/2008 | 5/20/2008 | 5/20/2008 8:02:55 AM | A | PART |
|
|
The insulation in tenant addresses 10442 and 10436 has been installed and can be covered.
|