FIR09-00164
| INSP-Sprinkler Rough-in/Hydro | 5/19/2009 | 5/20/2009 | 5/21/2009 1:23:39 PM | A | PART |
|
|
Overhead hydrostatic testing for the new system piping at the basement level as annotated on plan sheet FP1 completed satisfactory. OH rough-in also done for this area in conjunction with the hydrostatic test-noted blocked uprights at a storage room, final head locations may need adjusted as ceilings and lights are installed.
|
FIR09-00101
| INSP-Final Inspection | 5/19/2009 | 5/20/2009 | 5/20/2009 7:53:20 AM | P | DONE |
|
|
Duplicate inspection request.
|